  1. Question 1

    A manufacturing firm uses a legacy SCADA system that runs on a physical server with a specialized PCI card. The Business Impact Analysis (BIA) has established a Recovery Time Objective (RTO) of 4 hours. The current DR plan involves shipping tape backups to a cold site. During a recent test, the team discovered that sourcing and configuring a compatible server with the required PCI card would take at least 48 hours. Which of the following is the MOST cost-effective solution to meet the RTO?

    Answer and explanation

    Correct answer: B

    The most effective solution is to perform a P2V conversion. This decouples the legacy operating system and application from the specific underlying hardware. Once virtualized, the VM can be replicated to a warm site. This allows for rapid failover to dissimilar hardware, easily meeting the 4-hour RTO without the high cost of a full platform migration or a dedicated hot site. Migrating to a cloud-native platform is a major, expensive project, not a DR solution. A hot site would work but is very expensive. Improving logistics for the cold site doesn't solve the fundamental hardware dependency issue.

  2. Question 2

    Multiple answers

    A DR planner is designing a backup strategy for a distributed environment with multiple remote offices connected via high-latency WAN links. The goal is to minimize WAN traffic while ensuring data can be recovered efficiently at a central data center. Which combination of technologies would be MOST suitable for this scenario? (Select TWO)

    Answer and explanation

    Correct answers: A, C

    Source-side deduplication reduces the amount of data that needs to be sent over the WAN by eliminating redundant blocks before transmission. This directly addresses the goal of minimizing WAN traffic.

    A centralized backup server allows for the consolidation and management of backups from all remote offices, meeting the requirement for efficient recovery at a central data center.

  3. Question 3

    During a tabletop exercise for a business continuity plan, the facilitator presents a scenario where the primary data center has been rendered inaccessible due to a regional power outage. The DR team lead immediately instructs the technical staff to initiate the failover to the secondary site. Which critical step in the BCP activation process was missed?

    Answer and explanation

    Correct answer: C

    Before any technical failover procedures are initiated, a formal disaster declaration must be made by authorized executive management. This is a critical governance step that authorizes the significant resources, costs, and operational changes associated with activating the DR plan. The DR team lead does not typically have the authority to make this declaration independently. This step ensures the decision is made at the appropriate business level.

  4. Question 4

    A DR consultant is reviewing a company's data recovery strategy. The company uses virtualization extensively and has implemented VM replication to a secondary site with a 15-minute Recovery Point Objective (RPO). The consultant notes that while the virtual machines are replicated, the virtual network configurations, including VLANs, firewall rules, and IP addressing schemes, are managed manually and are not documented in the DR plan. What is the primary risk associated with this finding?

    Answer and explanation

    Correct answer: B

    While the VM data is available (meeting the RPO), the inability to quickly and accurately restore the network environment will significantly delay the process of bringing services back online. Manually reconfiguring complex network settings under pressure is time-consuming and error-prone, which directly impacts and extends the recovery time, making it highly likely that the RTO will be missed. The RPO is related to data loss, which is handled by replication, whereas RTO is about the time to restore service.

  5. Question 5

    True or False: In a Business Continuity Management System (BCMS) compliant with ISO 22301, the Business Impact Analysis (BIA) and risk assessment are independent activities that can be performed in any order.

    Answer and explanation

    Correct answer: B

    False. According to ISO 22301, the BIA and risk assessment are related and sequential activities. The BIA is conducted first to identify critical business activities and their recovery timeframes (RTOs). The results of the BIA then inform the risk assessment, which focuses on identifying risks to these specific critical activities. The BIA determines 'what' is important, and the risk assessment determines 'what' can harm it.

  6. Question 6

    A financial institution is required by regulators to demonstrate the ability to recover its trading platform at a secondary site and process transactions for a full business day. Which type of disaster recovery test would BEST satisfy this requirement?

    Answer and explanation

    Correct answer: C

    A parallel test is the most appropriate choice. In this test, the recovery site is brought online and used to process transactions in parallel with the primary production site. This allows the organization to validate the full functionality of the recovery environment under a realistic workload for an extended period (a full business day) without impacting live production operations. This provides the robust evidence required by regulators. A full-interruption test is too risky, and tabletop/walk-through tests do not involve actual system activation.

  7. Question 7

    A company is implementing a new backup solution. The backup administrator has configured a schedule that performs a full backup on Sunday and differential backups Monday through Saturday. If a complete server failure occurs on Thursday afternoon, what is the minimum set of backup media required to perform a full restoration?

    gantt title Backup Schedule dateFormat ddd axisFormat %a section Weekly Backups Full Backup :done, sun, 1d Differential :done, mon, 1d Differential :done, tue, 1d Differential :done, wed, 1d Crash Event :crit, active, thu, 0d Differential :fri, 1d Differential :sat, 1d

    Answer and explanation

    Correct answer: B

    A differential backup contains all changes made since the last full backup. Therefore, to restore a system that failed on Thursday, you need the last full backup (Sunday) and the most recent completed differential backup (Wednesday). The restore process involves restoring the Sunday full backup first, followed by the Wednesday differential backup. Thursday's backup would not have completed before the crash.

  8. Question 8

    A DR planner is evaluating storage technologies for a primary data center. The key requirements are high performance, high availability, and block-level storage access for a large database cluster. Which technology should be recommended?

    Answer and explanation

    Correct answer: B

    A Storage Area Network (SAN) is specifically designed to provide high-performance, low-latency, block-level storage access. It creates a dedicated network for storage traffic, typically using Fibre Channel or iSCSI. This architecture is ideal for demanding applications like large database clusters that require direct block-level access to disks for optimal performance and clustering capabilities. NAS provides file-level access, which is generally not suitable for this use case.

  9. Question 9

    The measure of the maximum tolerable period in which data might be lost from an IT service due to a major incident is known as the ______.

    Answer and explanation

    Correct answer: C

    The Recovery Point Objective (RPO) defines the maximum amount of data, measured in time, that can be lost after a recovery from a disaster. It essentially answers the question, 'To what point in time can the business's data be recovered?' An RPO of 1 hour means that at most, 1 hour of data will be lost.

  10. Question 10

    Case Study:

    Global Logistics Inc. (GLI) operates a central ERP system hosted on a VMware vSphere cluster in their primary data center in Chicago. The BIA identified the ERP system as Tier 1, with an RTO of 2 hours and an RPO of 15 minutes. The company has a secondary data center in Denver, which is currently used for development and testing workloads.

    The current DR strategy relies on nightly backups to a NAS, which are then replicated to the Denver site. This process results in an RPO of 24 hours. The IT team is small, and the budget for new DR initiatives is limited. Management has mandated a solution that leverages the existing Denver facility and minimizes operational overhead.

    The CIO has asked for a proposal to meet the stringent RTO/RPO requirements for the ERP system. The solution must be reliable and allow for non-disruptive testing. The existing network link between Chicago and Denver has sufficient bandwidth for continuous data replication.

    Which proposed solution BEST meets all of GLI's requirements and constraints?

    Answer and explanation

    Correct answer: C

    Hypervisor-based replication (like VMware vSphere Replication or third-party tools like Zerto/Veeam) is the ideal solution. It directly addresses the RPO requirement of 15 minutes through continuous or near-continuous data replication. It leverages the existing VMware environment and the Denver facility, meeting the constraint to use existing assets. This approach is generally more cost-effective than array-based replication and keeps the solution in-house, aligning with the limited budget and small team. It also allows for automated, non-disruptive testing, a key requirement. DRaaS is a viable option but doesn't leverage the existing Denver site. Array-based synchronous replication would be very expensive and may not be necessary to meet a 15-minute RPO.

Register free to unlock 10 more sample questions

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 204 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at

NvidiaSupabaseGitHubOpenAITursoClerkClaude AIAmazon