Cisco Collaboration Servers and Appliances Free Sample Questions

Description

Covers UCS appliance architecture, Business Edition platforms and contact center solutions, BIOS and Integrated Management Controller setup, VMware ESXi setup, and virtualized application deployment.

20 free sample questions209 in the full practice test

Try simulator

500-325 Sample Questions

  1. Question 1

    Beginner

    BIOS and Integrated Management Controller Setup · Describe BIOS setup

    A collaboration engineer is setting up a new Cisco UCS C220 M4 server for a BE6000M deployment. During the initial BIOS configuration, the engineer needs to ensure optimal performance for the virtualized UC applications. Which BIOS setting is critical to enable for the VMware ESXi hypervisor to function correctly?

    Answer and explanation

    Correct answer: B

    Intel Virtualization Technology (VT-x) or AMD-V for AMD processors is the hardware-assisted virtualization feature that must be enabled in the BIOS. This feature allows the hypervisor to create and manage virtual machines efficiently. While Hyper-Threading, Turbo Boost, and C-States affect performance, the hypervisor will not function without VT-x/AMD-V enabled.

  2. Question 2

    Intermediate

    Deploying Virtualized Applications · Migrate to a virtualized deployment

    An administrator is migrating a physical Cisco Unity Connection 10.x server to a virtual machine on a new BE7000H appliance. The goal is to minimize downtime and ensure data integrity. Which migration method is officially supported and recommended by Cisco for this scenario?

    Answer and explanation

    Correct answer: C

    Cisco does not support Physical-to-Virtual (P2V) migration tools like VMware Converter for its real-time UC applications due to potential timing and driver issues. The only supported method is to perform a full backup of the source server using the built-in Disaster Recovery System (DRS), deploy a new VM from the correct OVA template, and then restore the DRS backup to the new VM.

  3. Question 3

    Intermediate

    Unified Computing System Architecture · Describe the features of BE6000

    A consultant is designing a virtualized collaboration solution for a client with 900 users, requiring CUCM, Unity Connection, IM & Presence, and Expressway for MRA. The client wants a pre-packaged, single-server solution to simplify ordering and initial deployment. Which Cisco Business Edition model is the most appropriate choice?

    Answer and explanation

    Correct answer: C

    The BE6000H (High Density) is designed for deployments of up to 1000 users and supports multiple co-resident applications, including CUCM, CUC, IM&P, and Expressway. The BE4000 is for much smaller deployments. The BE6000S is for small deployments up to 150 users. The BE7000H is for larger deployments (over 1000 users) and would be oversized for this scenario.

  4. Question 4

    Advanced

    Deploying Virtualized Applications · Virtualize unified communications applications

    When deploying a Cisco UC application OVA template in VMware ESXi, the resource settings for CPU and memory are configured as reservations, not limits. What is the primary reason for this configuration?

    Answer and explanation

    Correct answer: B

    Cisco UC applications handle real-time voice and video traffic, which is highly sensitive to latency and jitter. By using reservations, the hypervisor guarantees that the specified amount of CPU and memory is always available to the VM, preventing resource contention and ensuring consistent performance. Setting a limit could throttle the application, while not setting a reservation could lead to resource starvation in a busy environment.

  5. Question 5

    IntermediateMultiple answers

    BIOS and Integrated Management Controller Setup · Describe BIOS setup

    An engineer is troubleshooting a VMware ESXi host running a CUCM cluster. The virtual machines are experiencing intermittent high latency. Upon investigation, the engineer suspects that the host's power management settings are causing the issue. Which two BIOS settings should be disabled or set to maximum performance to resolve this problem? (Select TWO)

    Answer and explanation

    Correct answers: A, D

    Processor C-States and other power-saving technologies (often labeled as Power Technology, SpeedStep, or similar) can cause latency for real-time applications by dynamically adjusting CPU frequency and core states. For optimal performance of UC applications, Cisco recommends disabling these power-saving features in the BIOS and setting the power profile to 'Maximum Performance' or 'OS Control'. VT-x is required for virtualization and should be enabled. Demand Scrubbing is a memory feature and is less likely to cause this type of latency.

  6. Question 6

    Intermediate

    Unified Computing System Architecture · Explain the purpose of Specs-based third-party

    A financial firm is deploying a new collaboration environment on Cisco UCS servers using the 'Specs-based' model with third-party servers. Which statement accurately describes the support boundary in this scenario?

    Answer and explanation

    Correct answer: C

    In a 'Specs-based' third-party server deployment, the customer assumes full responsibility for the hardware and the hypervisor layer. Cisco's support responsibility (via TAC) is limited to the Cisco Unified Communications applications themselves. The customer must work with their hardware vendor for any server-related issues and with VMware for any hypervisor-related issues.

  7. Question 7

    Beginner

    Unified Computing System Architecture · Describe the features of BE6000

    True or False: When deploying a Cisco BE6000 appliance, it is a supported practice to install third-party applications, such as an Active Directory domain controller, as additional virtual machines on the same ESXi host.

    Answer and explanation

    Correct answer: B

    Cisco Business Edition 6000/7000 appliances are purpose-built and tested for Cisco Collaboration applications only. Installing third-party applications on the same ESXi host (co-residency) is not a supported configuration and can void the support agreement. All virtual machines on a BE6000/7000 must be approved Cisco applications.

  8. Question 8

    Intermediate

    BIOS and Integrated Management Controller Setup · Describe network setup

    A network administrator is configuring the Cisco Integrated Management Controller (CIMC) on a new UCS C-Series server. For security and management best practices, which network configuration is recommended for the CIMC interface?

    graph TD subgraph Corporate LAN Users[Users/Admin PC] end subgraph Server Network style Server Network fill:#f9f,stroke:#333,stroke-width:2px UCS[UCS C-Series Server] UCS --> Switch[TOR Switch] end Users --> Switch CIMC_Port[CIMC Port] --> OOB_Switch[Out-of-Band Mgmt Switch] Admin_PC[Admin PC] --> OOB_Switch Switch --> Core OOB_Switch --> Core

    Answer and explanation

    Correct answer: B

    The best practice for security and reliability is to connect the CIMC to a dedicated out-of-band (OOB) management network. This isolates the critical hardware management interface from the production data and ESXi management networks, preventing potential security breaches and ensuring management access even if the production network is down.

  9. Question 9

    Beginner

    Introduction and Setup of VMware ESXi · Explain how to create virtual machines

    When creating a new virtual machine in VMware ESXi to host a Cisco Unity Connection node, which action is crucial immediately after the guest operating system installation is complete?

    Answer and explanation

    Correct answer: C

    Installing VMware Tools is a critical step after the guest OS installation. VMware Tools provides essential drivers for video, networking (VMXNET3), and memory management (balloon driver), which significantly improve the performance and manageability of the virtual machine. Without VMware Tools, the VM will have poor performance and limited functionality.

  10. Question 10

    Intermediate

    Unified Computing System Architecture · Explain the purpose of tested reference

    A company is comparing the Cisco 'Tested Reference Configuration' (TRC) approach against the 'DIY' approach for its new 2000-user collaboration deployment. What is a key advantage of choosing the TRC model?

    Answer and explanation

    Correct answer: C

    The main advantage of a Tested Reference Configuration (TRC) or Cisco Validated Design (CVD) is that the entire stack—hardware, firmware, hypervisor version, and application versions—has been tested and validated by Cisco. This ensures compatibility and performance, reduces deployment risks, and provides a clear path for support from Cisco TAC.

Register free for 10 more questions

Or unlock all 209 500-325 questions with explanations, timed mode and flashcards.