10/213 questions · Unlock full access
Q1

The network contains an Active Directory forest that has three domains. All domain controllers run Windows Server 2012. You need to recommend a solution to control which attributes are replicated to global catalog servers in the forest. What should you include in the recommendation?

Q2

This question consists of two statements: One is named Assertion and the other Is named Reason. Both of these statements may be true; both may be false; or one may be true, while the other may be false. To answer this question, you must first evaluate whether each statement is true on its own. If both statements are true, then you must evaluate whether the Reason (the second statement) correctly explains the Assertion (the first statement). You will then select the answer from the list of answer choices that matches your evaluation of the two statements. Assertion: DHCP failover clustering provides load balancing when you use multiple DHCP servers to distribute IP addresses to the network clients. Clients can renew their IP leases even if some of the DCHP servers become unavailable. DHCP failover clustering supports stateless and stateful IPv4 and IPv6 IP addresses, as well as DHCP policies and filtering. Reason: The cluster health monitoring mechanism ensures the fault tolerance of the DCHP service and all configured DHCP settings. It also protects the DHCP database from failures and corruptions. Evaluate the Assertion and Reason statements and choose the correct answer option.

Q3

You have an Active Directory domain named adutum.com. The domain contains a server named Served that runs Windows Server 2012 and has the Remote Access server role installed. Client computers run either Windows XP or Windows 8. Your company has defined requirements for three departments as shown in the table. You need to identify which remote access solution should be assigned for each group. Which solutions should you identify for each group? To answer, drag the appropriate solution to the correct requirement in the answer area. Each solution may be used once, more than once, or not at all. Additionally, you may need to drag the split bat between panes or scroll to view content.

Question image
Q4

Your network contains an Active Directory forest named contoso.com. You plan to deploy 200 new physical servers during the next 12 months by using Windows Deployment Services (WDS). You identify four server builds for the 200 servers as shown in the following table. You need to recommend the minimum number of images that must be created for the planned deployment. How many images should you recommend?

Question image
Q5

Your network contains a server named Served that runs Windows Server 2012. Served has the DHCP Server server role installed. The network contains a Virtual Desktop Infrastructure (VDI). All virtual machines run Windows 8. You identify the following requirements for allocating IPv4 addresses to client computers: • All virtual desktops must have static IP addresses. • All laptop computers must receive dynamic IP addresses. • All virtual desktops must be prevented from obtaining dynamic address. You need to recommend a DHCP solution that meets the requirements for allocating IPv4 addresses. The solution must use the least amount of administrative effort. What should you recommend? More than one answer choice may achieve the goal. Select the BEST answer.

Q6

You have a server named Served that runs Windows Server 2012. Served has the DNS Server server role installed. You need to recommend changes to the DNS infrastructure to protect the cache from cache poisoning attacks. What should you configure on Served?

Q7

Your company has three offices. The offices are located in New York, Chicago, and Atlanta. The network contains an Active Directory domain named contoso.com that has three Active Directory sites named Sitel, Site2, and Site3. The New York office is located in Sitel. The Chicago office is located in Site2. The Atlanta office is located in Site3. There is a local IT staff to manage the servers in each site. The current domain controllers are configured as shown in the following table. The company plans to open a fourth office in Montreal that will have a corresponding Active Directory site. Because of budget cuts, a local IT staff will not be established for the Montreal site. The Montreal site has the following requirements: • Users must be able to authenticate locally. • Users must not have the ability to log on to the domain controllers. • Domain account passwords must not be obtained from servers in the Montreal site. • Network bandwidth between the Montreal site and the other sites must be minimized. • Users in the Montreal office must have access to applications by using Remote Desktop Services (RDS). You need to recommend a solution for the servers in the Montreal site. What should you recommend?

Question image
Q8

You need to recommend a solution for GPO1. What is the best approach to achieve the goal? More than one answer choice may achieve the goal. Select the BEST answer.

Q9

Your company has a main office and four branch offices. The main office is located in London. The network contains an Active Directory domain named contoso.com. The network is configured as shown in the exhibit. (Click the Exhibit button.) Each office contains several servers that run Windows Server 2012. In each branch office, you plan to deploy an additional 20 servers that will run Windows Server 2012. Some of the servers will have a Server Core installation of Windows Server 2012. You identify the following requirements for the deployment of the new servers: • Operating system images must be administered centrally. • The operating system images must be deployed by using PXE. • The WAN traffic caused by the deployment of each operating system must be minimized. You need to recommend a solution for the deployment of the new servers. What should you recommend?

Question image
Q10

You implement and authorize the new DHCP servers. You import the server configurations and the scope configurations from PA1 and AM1 . You need to ensure that clients can obtain DHCP address assignments after you shut down PA1 and AM1. The solution must meet the technical requirements. What should you do?