Jira Administrator Free Sample Questions

12 free sample questions72 in the full practice test

Try simulator

ACP-100 Sample Questions

  1. Question 1

    A dashboard displays an Issue Statistics gadget as shown.

    The dashboard owner wants to change the order of the statuses shown in the gadget to appear as follows.

    • To Do
    • In Progress
    • Ready For QA
    • Blocked
    • Rejected
    • Done

    Which action will permanently arrange the statuses into the required order?

    Question 1 image
    Answer and explanation

    Correct answer: D

  2. Question 2

    In your organization, a cobbler leads a Jira project with two issue types:

    • Shoe Order
    • Repair

    The cobbler has given you the following requirements:

    • All screens should use the Summary, Description, Due Date, and Components fields.
    • Both issue types need to use a new custom field called Shoe Type on all screens.
    • The Priority field should appear on all screens for Repair issues.
    •Users should not be able to set the Priority for Shoe Orders during creation, but the Priority field still needs to be editable and viewable after creation.

    Identify the minimum number of screens and screen schemes that will meet the requirements.

    Answer and explanation

    Correct answer: A

    A

  3. Question 3

    Your HR project has two issue types:

    • Join
    • Leave

    Both issue types share a field configuration, screens and the workflow.

    You currently use the Due Date system field to indicate when someone actually joins or leaves.

    New HR staff members complain that using the Due Date field is not very intuitive.

    How can you help your HR team?

    Answer and explanation

    Correct answer: C

    C

  4. Question 4

    Multiple answers

    Which three factors should you consider when deciding between Jira Cloud and Jira Server? (Choose three.)

    Answer and explanation

    Correct answers: B, C, D

  5. Question 5

    You install a new Jira instance using only the default configurations. A team approaches you to set up a project with the following specifications:

    • There are four standard issue types and three sub-task issue types.
    • The first sub-task will need a new screen for the Edit operation.
    • The second sub-task will need new screens for both the Create and Edit operations.
    • Everything else should use the default configurations.

    How many new Screen Schemes do you need to create?

    Answer and explanation

    Correct answer: B

    B

  6. Question 6

    The configuration details of an SMTP Mail Server of a Jira instance are shown below.

    The configuration hasn’t been changed in the last 24 months.

    Currently emails are no longer being sent and the failed notifications can be seen in the Mail Error Queue.

    What is the likely cause of the failure?

    Question 6 image
    Answer and explanation

    Correct answer: E

    E

Register free to unlock 6 more sample questions

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 72 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at

NvidiaSupabaseGitHubOpenAITursoClerkClaude AIAmazon