IBM Maximo Manage V8.0 Implementation Free Sample Questions

20 free sample questions218 in the full practice test Other version: C1000-078(241)

Try simulator

C1000-132 Sample Questions

  1. Question 1

    A global logistics company is implementing Maximo Manage v8.0 across three continents. The corporate headquarters requires a unified chart of accounts and a standardized set of critical spare parts (Item Set) to be used globally. However, each continental division must manage its own vendors, purchasing contracts, and labor rates independently. Which configuration strategy correctly applies Maximo's organizational hierarchy to meet these requirements?

    Answer and explanation

    Correct answer: C

    This is the correct approach. In Maximo, financial information (Chart of Accounts) and master data like Item Sets are defined at the Organization level and shared by all Sites within that Organization. Site-level data, such as vendors (Companies), purchasing data, and labor records, can be managed independently at each Site. This hierarchy allows for centralized corporate control over key data while providing regional autonomy for operational data.

  2. Question 2

    A maintenance planner at a chemical processing plant is creating a complex, multi-stage Job Plan for a reactor shutdown. The procedure requires that a specific set of 'cool-down' tasks must only be generated if the initial 'de-pressurize' task is completed and a supervisor manually approves the next stage. How should the planner configure this conditional logic within the Maximo work management system?

    Answer and explanation

    Correct answer: C

    This is the most robust and correct method. Job Plans themselves do not contain conditional logic for task generation. The proper way to handle multi-stage approvals and conditional work is through Maximo's Workflow engine. A workflow can be designed to pause the Work Order after a specific task (or a Work Order status change), route it for approval, and then execute an action (like applying another Job Plan or creating follow-up work) based on the approval outcome.

  3. Question 3

    Multiple answers

    A reliability engineer is configuring the Asset Health Score for a fleet of critical pumps. The health score is based on vibration analysis data from Maximo Monitor and maintenance history from Maximo Manage. After setup, the engineer notices that the pumps' health scores are not updating, remaining at their initial values. Which of the following are the TWO most likely causes for this issue? (Select TWO).

    Answer and explanation

    Correct answers: A, C

  4. Question 4

    In Maximo Manage v8.0, the Service Request Work Center is configured to use the 'Similar Tickets' feature to help agents resolve issues faster. This feature relies on ticket classification to find relevant historical solutions. True or False: The underlying mechanism for this feature can be configured to use either the ticket's classification path or specific attributes on the ticket for matching.

    Answer and explanation

    Correct answer: A

    True. The Similar Tickets feature is highly configurable. By default, it may use the classification hierarchy to find matches. However, administrators can modify the underlying configuration in the System Properties or by editing the search query to use other fields and attributes on the ticket record, such as custom fields, asset details, or location, to provide more accurate and context-aware suggestions.

  5. Question 5

    A new Maximo administrator needs to prevent maintenance technicians from viewing the financial cost details on Work Order records. However, supervisors must still be able to see this information. The administrator has already created two separate security groups: TECHNICIAN and SUPERVISOR. What is the most direct and appropriate method in Maximo to implement this requirement?

    Answer and explanation

    Correct answer: C

    Conditional UI is the designed feature for controlling the visibility and editability of fields on an application screen based on user group membership or record conditions. By applying a condition to the TECHNICIAN group for the WOTRACK application, the administrator can specifically hide the cost-related fields for that group while leaving them visible for the SUPERVISOR group. This is more precise than application-wide changes or data restrictions, which control record access rather than field visibility.

  6. Question 6

    A manufacturing firm is setting up a safety program in Maximo Manage for its assembly line. A specific high-voltage cabinet requires a full Lock Out/Tag Out (LOTO) procedure before any maintenance can begin. Which applications must be used in conjunction to ensure that a Work Order for this cabinet automatically includes the LOTO procedure, identifies the electrical hazard, and lists the required personal protective equipment (PPE) as precautions?

    Answer and explanation

    Correct answer: B

    The correct process is to use the Safety Plan application as the central point for managing safety requirements. First, define the hazard (electrical) in the Hazards application and the precautions (PPE) in the Precautions application. Then, create a Lock Out/Tag Out procedure. Finally, create a Safety Plan, link the hazard, precautions, and LOTO procedure to it, and associate this comprehensive Safety Plan with the asset. When a Work Order is generated for that asset, it automatically inherits the safety information from the linked Safety Plan.

  7. Question 7

    A new implementation of Maximo Manage needs to track costs for work performed on assets belonging to different corporate departments. The finance department requires that all labor, material, and tool costs from a work order are automatically posted to the correct departmental GL account associated with the asset's location. Where must the GL accounts be primarily defined to achieve this automatic cost rollup?

    flowchart TD WO[Work Order] -->|Costs| L[Labor] WO -->|Costs| M[Materials] WO -->|Costs| T[Tools] subgraph Cost_Rollup L --> GL{GL Account} M --> GL T --> GL end GL --> FIN(Financial System) A(Asset) -- Located In --> LOC(Location) LOC -- Has --> GL
    Answer and explanation

    Correct answer: D

    Maximo's financial posting logic is hierarchical. When a work order is created for an asset, it first looks for a GL account on the asset record itself. If none is found, it looks to the asset's location. If still not found, it continues up the location hierarchy. To ensure costs are posted based on departmental location, defining the GL accounts on the primary Location records is the standard and most effective method. This allows all assets within that location to automatically inherit the correct GL account for cost tracking.

  8. Question 8

    A consultant is configuring the inventory reordering process for a client. The client wants to use the 'Reorder Point' and 'Economic Order Quantity' (EOQ) values on the Inventory record to automatically generate Purchase Requisitions. Which specific Maximo cron task is responsible for running this process?

    Answer and explanation

    Correct answer: C

    The ReorderCronTask is the background process that periodically checks inventory levels against the defined reorder points. When the current balance falls below the reorder point for an item, this cron task initiates the reorder process, which can be configured to create Purchase Requisitions, internal transfer requests, or add items to a reorder list.

  9. Question 9

    Multiple answers

    A utility company uses meter-based Preventive Maintenance (PM) records to trigger maintenance on its fleet of vehicles based on mileage. A technician correctly enters a new mileage reading in the Meter Readings dialog, but the corresponding PM fails to generate a work order. What are THREE possible configuration issues that could cause this? (Select THREE).

    Answer and explanation

    Correct answers: A, B, D

  10. Question 10

    Which Maximo Application Suite component is primarily designed to ingest, process, and analyze time-series data from IoT sensors and is a critical prerequisite for enabling predictive maintenance models in Maximo Predict?

    Answer and explanation

    Correct answer: C

    Maximo Monitor is the component of the Maximo Application Suite specifically built for collecting and analyzing data from IoT devices and sensors. It provides the data platform and analytical functions (like anomaly detection) that feed into other applications. Maximo Predict relies on the historical and real-time data managed by Maximo Monitor to build and run its predictive failure models.

Register free to unlock 10 more sample questions

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 459 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at