Question 1
A network engineer is designing a 1.2 km point-to-point wireless bridge using the 5 GHz band. A building under construction is located directly in the path, 0.5 km from one end. To ensure link reliability, 60% of the first Fresnel zone must remain clear of this obstruction. What is the minimum required height clearance above the building?
Answer and explanation
Correct answer: B
The formula for the radius of the first Fresnel zone is r = 17.32 * sqrt((d1d2)/(fD)), where d1 and d2 are distances from the ends, D is total distance, and f is frequency in GHz. At the building location (d1=0.5, d2=0.7, D=1.2, f=5), the radius is ~8.15 meters. 60% clearance requires 0.60 * 8.15 = ~4.9 meters. The other options result from common calculation errors.