Question 1
Q1A solutions architect is designing a PowerMax 8500 solution for a financial institution. During the PowerSizer analysis, the output summary indicates a 90% backend director utilization for a proposed workload. However, upon reviewing the manufacturing bin file, the architect notices that the configuration includes fewer backend slices than recommended by the PowerSizer tool for that utilization level. What is the most critical risk associated with this discrepancy?
Show answer & explanation
Correct answer: D
The manufacturing bin file represents the actual hardware that will be shipped. If it has fewer backend slices than what PowerSizer determined was necessary to handle the workload (resulting in 90% utilization), the backend directors will be under-provisioned. This will lead to contention and bottlenecks, causing high latencies and an inability to meet performance SLAs, which is the primary risk of such a discrepancy.