A solutions architect is designing a PowerMax 8500 solution for a financial institution. During the PowerSizer analysis, the output summary indicates a 90% backend director utilization for a proposed workload. However, upon reviewing the manufacturing bin file, the architect notices that the configuration includes fewer backend slices than recommended by the PowerSizer tool for that utilization level. What is the most critical risk associated with this discrepancy?