Aruba Certified Switching Professional (ACSP) Free Sample Questions

Description

Covers wired network implementation planning, NetEdit and physical switch installation, Layer 2 technology configuration, network troubleshooting, and configuration management.

17 free sample questions158 in the full practice test Other versions: HPE6-A86(165),HPE6-A41(123),HPE6-A69(255),HPE6-A72(157)

Try simulator

HPE6-A73 Sample Questions

  1. Question 1

    Intermediate

    Which statement is correct regarding ACLs and TCAM usage?

    Answer and explanation

    Correct answer: A

  2. Question 2

    Intermediate

    What is correct regarding rate limiting and egress queue shaping on AOS-CX switches?

    Answer and explanation

    Correct answer: D

  3. Question 3

    Intermediate

    A network administrator needs to replace an antiquated access layer solution with a modular solution involving AOS-CX switches. The administrator wants to leverage virtual switching technologies. The solution needs to support high-availability with dual-control planes.Which solution should the administrator implement?

    Answer and explanation

    Correct answer: B

  4. Question 4

    Intermediate

    A company has implemented 802.1X authentication on AOS-CX access switches, where two ClearPass servers are used to implement AAA. Each switch has the two servers defined. A network engineer notices the following command configured on the AOS-CX switches: radius-server tracking user-name monitor password plaintext aruba123What is the purpose of this configuration?

    Answer and explanation

    Correct answer: E

  5. Question 5

    Advanced

    Plan the wired network solution · Implementation Planning

    A Senior Network Architect is designing a high-availability campus core for a financial institution with two Aruba CX 8325 switches in a VSX pair. The keepalive link is routed through a separate management network. The client requires that if the ISL fails while the keepalive stays up (a VSX split), the secondary switch must also shut down its SVIs, which are non-VSX interfaces and would otherwise stay up, so that no traffic is routed into the out-of-sync secondary. Which VSX configuration setting provides this SVI shutdown behavior?

    Answer and explanation

    Correct answer: D

    'vsx shutdown-on-split' is the AOS-CX interface command that 'shuts down the configured non-VSX interfaces on the VSX secondary along with VSX interfaces during a VSX split', and the VSX Guide shows it applied to an SVI (interface vlan 2). In a VSX split the ISL goes out of sync while the keepalive is still up: the secondary already brings its VSX LAGs down, but its non-VSX interfaces, such as SVIs, stay up unless they carry this command (AOS-CX 10.13 VSX Guide, 'VSX shutdown-on-split'). 'split-recovery' does the opposite job: it is enabled by default and, when the keepalive also fails after the ISL, makes the secondary bring its VSX LAGs back up. 'linkup-delay-timer' only delays bringing VSX links up after a reboot or an ISL flap (default 180 seconds), and 'isl-protection' is not a VSX command.

  6. Question 6

    Intermediate

    Plan the wired network solution · Implementation Planning

    An administrator is planning the subnet sizing for a new building that will utilize Dynamic Segmentation with User-Based Tunneling (UBT). There will be approximately 2000 users. All traffic will be tunneled back to a cluster of Aruba Gateways. What is a critical design consideration regarding the VLAN configuration on the access layer CX 6300 switches?

    Answer and explanation

    Correct answer: A

    In a User-Based Tunneling (UBT) deployment, the user traffic is encapsulated in GRE tunnels at the access switch and sent to the Gateway. The access switch only needs a 'reserved' VLAN (often called a transport or intermediate VLAN) to initiate the tunnel. The actual client VLANs where the users' IP addresses reside must exist on the Gateway, but they are NOT required (and often not recommended) to be configured on the local access switches.

  7. Question 7

    Intermediate

    Plan the wired network solution · Implementation Planning

    A network consultant is designing a migration plan from a legacy three-tier architecture to a collapsed core using Aruba CX 8360 switches. The current environment uses PVST+ with 500 VLANs. The new design will utilize MSTP. Which design decision ensures the smoothest interoperability during the migration phase?

    Answer and explanation

    Correct answer: D

    When interfacing MSTP with PVST+, the MSTP region appears as a single bridge (the IST master). To prevent topology loops and issues, it is best practice for the MSTP region to be the root of the CST (Common Spanning Tree), or for the PVST+ root to be consistent for ALL VLANs. This ensures the interaction on the boundary links is predictable.

  8. Question 8

    Beginner

    Install and configure the wired network solution · Layer 2 Technologies

    You are configuring a VSX cluster on two CX 6400 switches. You have configured the Inter-Switch Link (ISL) on a 100GbE LAG. Which requirement regarding the ISL VLAN membership is mandatory for VSX synchronization to function correctly?

    Answer and explanation

    Correct answer: B

    The VSX ISL (Inter-Switch Link) serves as the data path for traffic between the two VSX nodes for any VLANs that need to traverse the cluster (e.g., during single-link failures). Therefore, the ISL LAG must be configured as a trunk allowing all VLANs that are active on the VSX downstream links.

Register free for 9 more questions