An installer is performing a pre-installation site survey for a new Hitachi VSP E790 with two expansion drive boxes. The customer's data center uses top-of-rack power distribution units (PDUs) with IEC C19 outlets. The VSP E790 requires four power connections for the controller chassis and two for each drive box. What is the primary power-related consideration the installer must verify with the data center manager?