Leed Green Associate Free Sample Questions

Description

Covers LEED rating system structure, integrative design strategies, site selection and transportation, water and energy efficiency, materials selection, and indoor environmental quality.

20 free sample questions234 in the full practice test

Try simulator

LEED-GA Sample Questions

  1. Question 1

    A project team is developing a 150,000 sq. ft. corporate headquarters on a suburban campus. The owner wants to achieve exemplary performance for outdoor water use reduction. The baseline landscape water requirement (LWR) calculated using the EPA WaterSense Water Budget Tool is 2,500,000 gallons per year. Which of the following landscape designs would achieve the owner's goal?

    Answer and explanation

    Correct answer: C

    Exemplary performance for Outdoor Water Use Reduction requires a 100% reduction from the baseline. A xeriscape design that requires no permanent irrigation achieves this 100% reduction. Option A represents a 50% reduction (1,250,000 / 2,500,000), which would earn the base credit but not exemplary performance. Option B represents a 30% reduction, meeting only the prerequisite. Option D represents a 70% reduction, which is excellent but does not meet the 100% threshold for exemplary performance.

  2. Question 2

    Multiple answers

    During a pre-design charrette for a new hospital, the project team discusses the integrative process. The mechanical engineer suggests that analyzing the building's orientation and massing early on can have significant downstream effects. Which of the following outcomes are direct results of optimizing a building's orientation and massing in the integrative process? (Select THREE)

    Answer and explanation

    Correct answers: A, C, D

    The integrative process emphasizes early analysis of interconnected systems. Optimizing orientation and massing directly impacts solar heat gain and daylight access. This reduces peak heating/cooling loads (C), which in turn allows for a smaller, more efficient HVAC system (A), a concept known as right-sizing. It also maximizes the potential for passive strategies like daylighting (B). Sourcing of local materials (D) is a separate consideration related to the Materials and Resources category and is not a direct result of orientation and massing decisions.

  3. Question 3

    True or False: A project can earn the maximum of 4 Regional Priority points by achieving any four of the six available Regional Priority credits identified for its location.

    Answer and explanation

    Correct answer: A

    This statement is true. Regional Priority credits are bonus points. For any given project location, USGBC designates six existing LEED credits as being of special importance. If a project earns one of these designated credits, it automatically receives one bonus point in the Regional Priority category, up to a maximum of four bonus points.

  4. Question 4

    A project team is evaluating flooring options for a school in Atlanta, GA. They are considering a bamboo product that is harvested and manufactured in China and shipped to the project site. Which LEED sustainable material attributes would this product contribute to?

    Answer and explanation

    Correct answer: B

    Bamboo is a type of grass with a harvest cycle of less than 10 years, so it qualifies as a rapidly renewable material. However, since it is harvested and manufactured in China, it does not meet the requirement for Regional Materials, which must be extracted and manufactured within a 500-mile radius of the project site in Atlanta. FSC certification is for wood products from responsibly managed forests and is a separate attribute not mentioned in the product description.

  5. Question 5

    A new office building project includes a large, exposed aggregate concrete plaza that constitutes 60% of the site's non-roof hardscape. The initial concrete mix has a Solar Reflectance Index (SRI) of 15. The project is located in a dense urban area and needs to mitigate the heat island effect. What is the most effective strategy to meet the requirements for Heat Island Reduction for this plaza?

    Answer and explanation

    Correct answer: B

    To mitigate the heat island effect for non-roof hardscapes, LEED requires materials to have a minimum SRI of 29. The most direct and effective strategy is to change the material specification itself to meet this requirement. Using white cement and lighter aggregates directly increases the SRI value. A dark sealant would lower the SRI. Shading can be a valid strategy, but shading only 50% may not be sufficient depending on the rest of the site, and changing the material is a more direct approach. Open grid pavers are another valid strategy but would require a complete redesign of the plaza, making it less practical than adjusting the concrete mix.

  6. Question 6

    A project is located in a dense urban center with excellent access to public transportation, including multiple bus lines and a subway station within a 1/4-mile walk. The developer wants to minimize parking to reduce costs and encourage sustainable transit. Which strategy would earn points in the Location and Transportation category for this project?

    Answer and explanation

    Correct answer: B

    The goal of the Reduced Parking Footprint credit is to minimize the environmental harms associated with parking, including land consumption and encouraging driving. Providing no new parking is the highest-achieving strategy for this credit. Exceeding zoning requirements is the opposite of the credit's intent. Providing preferred parking is a separate credit (Green Vehicles). Providing only the minimum required parking is a good first step but providing no new parking is a specific strategy that earns the most points.

  7. Question 7

    What is the primary role of the Green Business Certification Inc. (GBCI) in the LEED certification process?

    Answer and explanation

    Correct answer: B

    A key distinction to understand is the separate roles of the USGBC and GBCI. The USGBC (U.S. Green Building Council) is responsible for developing the LEED rating systems. The GBCI (Green Business Certification Inc.) was established to provide independent, third-party administration of the certification and credentialing processes. This includes reviewing project submissions and administering exams like the LEED Green Associate.

  8. Question 8

    During construction of a new office building, the general contractor is responsible for implementing the construction IAQ management plan. According to SMACNA guidelines, which of the following actions is critical to protecting the HVAC system before occupancy?

    Answer and explanation

    Correct answer: B

    The Sheet Metal and Air Conditioning National Contractors Association (SMACNA) guidelines for construction IAQ emphasize protecting the HVAC system from contamination. The most critical action is to seal all ductwork openings and equipment to prevent dust, debris, and moisture from entering the system during construction. Running the system can draw contaminants in. Using MERV 8 filters is a requirement, but it's done after the system is protected during construction and before occupancy. Cleaning ducts is a remedial action, whereas sealing them is a preventative one.

  9. Question 9

    Multiple answers

    A project team is performing a life-cycle cost analysis (LCCA) for the building's exterior lighting. Which of the following costs should be included in the analysis? (Select ALL that apply)

    Answer and explanation

    Correct answers: A, B, D, E

    A life-cycle cost analysis (LCCA) considers all costs associated with a product or system from 'cradle to grave'. This includes the initial purchase and installation costs (A), ongoing operational costs like energy (B), maintenance and replacement costs (D), and end-of-life disposal or salvage costs (E). Subjective values like marketing appeal (C) are typically not included in a standard LCCA.

  10. Question 10

    A project team is pursuing the Innovation credit for having a LEED Accredited Professional on the team. To earn this point, the LEED AP must be a principal participant on the project. Which of the following roles would MOST likely qualify?

    Answer and explanation

    Correct answer: C

    To earn the LEED AP credit, the accredited professional must be a 'principal participant' involved in the project from an early stage and throughout the process. The project architect who is involved from design through construction is a core team member and clearly qualifies. The other roles represent minimal or late-stage involvement and would not meet the intent of the credit, which is to have LEED expertise integrated into the project's decision-making process.

Register free for 10 more questions

Or unlock all 234 LEED-GA questions with explanations, timed mode and flashcards.