Microsoft Dynamics 365 Supply Chain Management Free Sample Questions

20 free sample questions242 in the full practice test

Try simulator

MB-330 Sample Questions

  1. Question 1

    A pharmaceutical company uses Dynamics 365 Supply Chain Management to manage its inventory of controlled substances. For a specific batch-tracked item, the quality control department must approve each batch before it can be used in production or sold. Currently, new batches are received with an 'Available' inventory status, posing a compliance risk. You need to ensure all new batches of this item are automatically placed into a non-nettable, blocked status upon receipt, pending quality approval. Which configuration should you implement?

    Answer and explanation

    Correct answer: B

    The most direct and standard way to achieve this is by setting a default inventory status on the released product or warehouse item settings. By creating an inventory status such as 'Awaiting QC' and disabling 'Inventory blocking' for it, you ensure that any new receipts for this item are automatically assigned this status. This makes the inventory non-nettable and unavailable for issue until manually updated by an authorized user after quality control processes are complete. While a quality association can trigger a quality order, it doesn't inherently change the inventory status upon receipt by default. Using item model groups affects costing and other policies but not the initial receipt status. A location directive guides movement but does not control inventory status.

  2. Question 2

    A global electronics manufacturer is implementing the Asset Management module in Dynamics 365 Supply Chain Management. They have complex assembly lines where a single functional location, like 'Assembly Line 5', contains multiple parent assets (e.g., 'Robot Arm 1', 'Conveyor Belt 2'), which in turn have their own child assets (e.g., 'Motor', 'Sensor'). A maintenance request is created for 'Assembly Line 5'. The maintenance planner needs to create a single parent work order for the entire line and have the system automatically generate child work orders for all parent and child assets installed at that functional location. How should this be configured?

    Answer and explanation

    Correct answer: D

    The key to this requirement is a system-wide parameter that governs how work orders are created from functional locations. In the Asset management parameters, the 'Create work order from functional location' setting controls this behavior. Setting it to 'One work order per asset' instructs Dynamics 365 to automatically create a separate work order for every asset installed at the selected functional location when a work order is initiated from that location. This creates the desired parent-child structure automatically, linking all asset-specific work orders to the functional location. Other options require significant manual intervention or do not create the comprehensive structure requested.

  3. Question 3

    Multiple answers

    A company imports goods from overseas and uses the Landed cost module. A single voyage contains products from multiple purchase orders. The freight cost for the entire voyage is $5,000. The company needs to apportion this cost across the items based on their volumetric measurement (CBM). Which configuration is necessary to achieve this?

    Select TWO that apply.

    Answer and explanation

    Correct answers: A, B

    To apportion landed costs by volume, two key configurations are required. First, a cost type code (e.g., 'Freight') must be configured with an apportionment method of 'Volume'. This tells the system how to distribute the cost. Second, the system needs the volumetric data to perform the calculation. This data is pulled from the 'Volume' field on the 'Manage inventory' fast tab of the released product master. Without both of these pieces of information, the system cannot correctly apportion the freight cost based on volume.

  4. Question 4

    A distribution company is configuring the Warehouse Management mobile app. For the purchase order receiving process, they want warehouse workers to be able to capture a photo of the delivery paperwork and attach it to the receipt journal. This action should be optional and available at any step of the receiving flow. Which feature should be used to implement this functionality?

    Answer and explanation

    Correct answer: D

    Detours are designed to allow workers to temporarily interrupt a primary task to perform a secondary one. By creating a detour for attaching a document (which is a standard feature) and configuring it as a global detour, it becomes available from any step in any workflow on the mobile device. This meets the requirement for the action to be optional and accessible throughout the receiving process. An indirect menu item is for activities not related to work (like inquiries), a custom work exception is for handling problems, and page scripts are for customizing UI elements, not for adding functionality like this.

  5. Question 5

    True or False: When using Planning Optimization, the 'Firming' time fence on an item's coverage group will prevent Planning Optimization from proposing any changes to firmed planned orders within the specified number of days.

    Answer and explanation

    Correct answer: B

    This statement is false. The 'Firming' time fence automatically firms any newly created planned orders that fall within the specified number of days from the planning run date. It does not prevent Planning Optimization from suggesting changes (e.g., action messages) to already firmed orders, whether they were firmed manually or automatically. The purpose is to automate the firming of near-term supply, not to create a frozen zone for existing firmed orders.

  6. Question 6

    A company manufactures custom furniture. They use a standard costing model. At the end of the month, the production manager notices significant unfavorable variance postings for a popular table model. The variance is attributed to a recent, permanent price increase for the primary wood material. To prevent this variance in future production orders, the cost accountant must update the standard cost of the table. What is the correct sequence of steps to update and activate the new standard cost?

    Answer and explanation

    Correct answer: C

    The correct process for a standard cost rollup is sequential and structured. First, a new costing version is created to contain the pending cost changes. Then, the cost of the component (the raw material) must be updated and activated first. Once the raw material has a new active standard cost, the BOM calculation for the finished good can be run. This calculation will pull the new active cost of the component to accurately calculate the rolled-up cost of the finished product. Finally, the new calculated cost for the finished good must be activated to be used in future transactions.

  7. Question 7

    A company uses transfer orders to move goods between its main warehouse (WH1) and a retail store (WH2). When a transfer order is shipped from WH1, the inventory should no longer be available at WH1 but should not yet be available at WH2. This inventory must be financially tracked in a dedicated 'In-Transit' ledger account. Which setup is required to achieve this?

    WH1 (Source) ---[Shipment]---> (In-Transit) ---[Receipt]---> WH2 (Destination)
    
    Answer and explanation

    Correct answer: B

    The standard functionality to manage in-transit inventory for transfer orders is by using a transit warehouse. A virtual warehouse should be created for this purpose. This transit warehouse is then assigned in the 'Transit warehouse' field on the main warehouse's setup page (specifically, the source warehouse in the shipping relationship). When a transfer order is shipped, the system automatically moves the inventory from the source warehouse to this designated transit warehouse, where it remains until it is received at the destination. This provides both physical and financial visibility of in-transit stock.

  8. Question 8

    You are a functional consultant for a company that uses vendor collaboration to allow vendors to confirm purchase orders. A new policy requires that if a vendor suggests a delivery date that is more than 5 days later than the requested date on the PO, the PO confirmation must be sent to the purchasing manager for internal approval before the system accepts the change. Which feature should you use to enforce this policy?

    Answer and explanation

    Correct answer: C

    The 'Purchase order vendor confirmation' workflow is specifically designed to manage the approval process for POs confirmed by vendors through the collaboration portal. This workflow can be configured with conditional steps. You can add a condition that checks if the 'Confirmed delivery date' on the PO line is more than 5 days after the 'Delivery date'. If this condition is met, the workflow can route the confirmation to a specific user or user group (like the purchasing manager) for approval. This directly addresses the requirement to handle exceptions based on delivery date changes.

  9. Question 9

    Multiple answers

    A company has a pick-and-pack process in their warehouse. Small items are picked into a tote (license plate). Once picking is complete, the tote is moved to a packing station. At the packing station, the worker scans the tote LP, packs the items into a shipping container, and prints a shipping label for the new container. The original tote is then emptied and returned for reuse. Which mobile device menu items are required to support this process?

    Select THREE that apply.

    Answer and explanation

    Correct answers: A, C, F

    This process involves three distinct stages supported by specific menu items. First, 'Sales picking' (or a similar picking process) is used to pick items into the tote. Second, at the packing station, a 'Packing' process menu item is used to scan the tote and move its contents into a new shipping container. Finally, after packing is complete, a 'Container close/reopen' process is needed to finalize the shipping container, which typically triggers label printing and updates the shipment status.

  10. Question 10

    A manufacturing company needs to implement cycle counting. To minimize disruption, they want to count a small number of high-value items every day. They have performed an ABC analysis, and items classified as 'A' are the highest value. You need to configure the system to automatically generate counting work daily, but only for three 'A' items that have not been counted in the last 7 days. Which combination of configurations will achieve this?

    Answer and explanation

    Correct answer: C

    This requirement is met by configuring a cycle count plan. The plan should be filtered using a query to only include items where the ABC code is 'A'. The 'Days between cycle counting' field ensures that once an item is counted, it won't be suggested again for 7 days. The 'Maximum number of cycle counts' field limits the generated work to 3 items per run. Finally, scheduling the 'Cycle count work by plan' periodic job ensures this logic is executed automatically every day to generate the required work.

Register free to unlock 10 more sample questions

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 242 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at

NvidiaSupabaseGitHubOpenAITursoClerkClaude AIAmazon