10/242 questions · Unlock full access
Q1

A pharmaceutical company uses Dynamics 365 Supply Chain Management to manage its inventory of controlled substances. For a specific batch-tracked item, the quality control department must approve each batch before it can be used in production or sold. Currently, new batches are received with an 'Available' inventory status, posing a compliance risk. You need to ensure all new batches of this item are automatically placed into a non-nettable, blocked status upon receipt, pending quality approval. Which configuration should you implement?

Q2

A global electronics manufacturer is implementing the Asset Management module in Dynamics 365 Supply Chain Management. They have complex assembly lines where a single functional location, like 'Assembly Line 5', contains multiple parent assets (e.g., 'Robot Arm 1', 'Conveyor Belt 2'), which in turn have their own child assets (e.g., 'Motor', 'Sensor'). A maintenance request is created for 'Assembly Line 5'. The maintenance planner needs to create a single parent work order for the entire line and have the system automatically generate child work orders for all parent and child assets installed at that functional location. How should this be configured?

Q3Multiple answers

A company imports goods from overseas and uses the Landed cost module. A single voyage contains products from multiple purchase orders. The freight cost for the entire voyage is $5,000. The company needs to apportion this cost across the items based on their volumetric measurement (CBM). Which configuration is necessary to achieve this? Select TWO that apply.

Q4

A distribution company is configuring the Warehouse Management mobile app. For the purchase order receiving process, they want warehouse workers to be able to capture a photo of the delivery paperwork and attach it to the receipt journal. This action should be optional and available at any step of the receiving flow. Which feature should be used to implement this functionality?

Q5

True or False: When using Planning Optimization, the 'Firming' time fence on an item's coverage group will prevent Planning Optimization from proposing any changes to firmed planned orders within the specified number of days.

Q6

A company manufactures custom furniture. They use a standard costing model. At the end of the month, the production manager notices significant unfavorable variance postings for a popular table model. The variance is attributed to a recent, permanent price increase for the primary wood material. To prevent this variance in future production orders, the cost accountant must update the standard cost of the table. What is the correct sequence of steps to update and activate the new standard cost?

Q7

A company uses transfer orders to move goods between its main warehouse (WH1) and a retail store (WH2). When a transfer order is shipped from WH1, the inventory should no longer be available at WH1 but should not yet be available at WH2. This inventory must be financially tracked in a dedicated 'In-Transit' ledger account. Which setup is required to achieve this? ``` WH1 (Source) ---[Shipment]---> (In-Transit) ---[Receipt]---> WH2 (Destination) ```

Q8

You are a functional consultant for a company that uses vendor collaboration to allow vendors to confirm purchase orders. A new policy requires that if a vendor suggests a delivery date that is more than 5 days later than the requested date on the PO, the PO confirmation must be sent to the purchasing manager for internal approval before the system accepts the change. Which feature should you use to enforce this policy?

Q9Multiple answers

A company has a pick-and-pack process in their warehouse. Small items are picked into a tote (license plate). Once picking is complete, the tote is moved to a packing station. At the packing station, the worker scans the tote LP, packs the items into a shipping container, and prints a shipping label for the new container. The original tote is then emptied and returned for reuse. Which mobile device menu items are required to support this process? Select THREE that apply.

Q10

A manufacturing company needs to implement cycle counting. To minimize disruption, they want to count a small number of high-value items every day. They have performed an ABC analysis, and items classified as 'A' are the highest value. You need to configure the system to automatically generate counting work daily, but only for three 'A' items that have not been counted in the last 7 days. Which combination of configurations will achieve this?