IBM Power Virtual Server v1 Specialty Free Sample Questions

20 free sample questions199 in the full practice test

Try simulator

S2000-020 Sample Questions

  1. Question 1

    Multiple answers

    A financial services company is designing a multi-region disaster recovery solution for their critical applications running on both AIX and IBM i within Power Virtual Server. The AIX environment uses PowerHA SystemMirror, and the IBM i environment uses a third-party logical replication tool. They require a unified, private network backbone to connect their primary site in Dallas (DAL) with their DR site in Frankfurt (FRA). Which networking services should be combined to achieve this goal? (Select TWO)

    Answer and explanation

    Correct answers: A, B

    IBM Cloud Transit Gateway is the primary service for creating a private, global backbone to connect different IBM Cloud resources, including PowerVS workspaces, across multiple regions.

    Direct Link is required to establish the private, dedicated connection from the on-premises data centers to the IBM Cloud network. The Transit Gateway then connects these on-ramps and the PowerVS workspaces together.

  2. Question 2

    An architect is tuning an Oracle database workload on a POWER10-based Power Virtual Server instance. The workload is characterized by a high number of concurrent, short-lived transactions. To maximize throughput, the architect needs to select the optimal Simultaneous Multi-Threading (SMT) mode. How does the POWER10 processor's SMT implementation differ from POWER9, and which mode is generally recommended for this type of workload?

    Answer and explanation

    Correct answer: B

    A key enhancement in POWER10 is that each core is composed of two SMT4 execution engines, allowing more efficient instruction execution in SMT8 mode. For workloads with high thread-level parallelism, like many concurrent database transactions, SMT8 allows the core to be fed with instructions continuously, maximizing throughput.

  3. Question 3

    A solutions architect is deploying a new SAP HANA instance on Power Virtual Server. The SAP sizing guidelines specify a requirement for data volumes to sustain at least 15,000 IOPS with sub-5ms latency during peak processing. The client also requires the ability to create near-instantaneous, space-efficient copies of the data volumes for testing purposes. Which storage tier and feature combination in Power Virtual Server meets these requirements?

    Answer and explanation

    Correct answer: B

    Tier 1 storage is based on NVMe drives, providing 10 IOPS/GB and the low latency required for demanding workloads like SAP HANA. A 1.5TB volume would provide 15,000 IOPS. The Snapshot feature allows for the creation of point-in-time, space-efficient copies ideal for non-disruptive testing and development.

  4. Question 4

    Company Background:
    Global Retail Inc. runs its mission-critical SAP ERP Central Component (ECC) system on-premises on an aging IBM Power7 server with AIX 7.1. The company is facing high maintenance costs and lacks disaster recovery capabilities. They plan to migrate to SAP S/4HANA and have chosen IBM Power Virtual Server as their target platform to leverage their existing AIX skills and ensure high performance for the in-memory database.

    Current Situation:
    The on-premises environment consists of a large 10TB Oracle database and multiple application servers. The migration plan involves a two-step process: first, a lift-and-shift of the existing ECC environment to PowerVS for stabilization, and second, a subsequent project to upgrade to S/4HANA. The company has a 1 Gbps Direct Link connection to the IBM Cloud data center in Washington D.C.

    Requirements:

    1. The initial lift-and-shift migration must be completed with a maximum downtime of 8 hours.
    2. The target PowerVS environment must provide isolated networking for production, non-production, and management traffic.
    3. The storage solution for the database must support high IOPS and low latency.
    4. A disaster recovery site must be established in another region with an RPO of less than 15 minutes.

    Which proposed solution best meets all the stated requirements?

    Answer and explanation

    Correct answer: B

    This is the optimal solution. A logical migration can be timed to fit the downtime window. Separate subnets provide network isolation. Tier 1 storage meets the performance needs of the database. VM Recovery Manager DR is a supported IBM solution for achieving low RPOs for disaster recovery in PowerVS.

  5. Question 5

    An administrator is troubleshooting a network connectivity issue where a Power Virtual Server instance cannot communicate with an on-premises server over a Direct Link Connect connection. The PowerVS instance and the on-premises server are on different subnets. The Direct Link is showing as 'UP' in the IBM Cloud portal. What is the most likely cause of this issue?

    Answer and explanation

    Correct answer: C

    Direct Link uses BGP (Border Gateway Protocol) to exchange routes between the on-premises network and the IBM Cloud private network. If the Direct Link is up but there is no connectivity, the most common reason is a routing issue where the on-premises router has not learned the path to the PowerVS subnet, or vice-versa. This can be due to incorrect BGP configurations or route filters.

  6. Question 6

    True or False: When running an Oracle database on a Power Virtual Server instance with a shared processor pool, Oracle licensing must be based on the total number of physical cores in the entire server frame, regardless of the LPAR's entitled capacity.

    Answer and explanation

    Correct answer: B

    This statement is false. IBM PowerVM's LPARs are considered hard partitioning by Oracle. Therefore, clients can license Oracle software based on the virtual cores allocated to the specific LPAR where the database is running, not the entire physical server. This provides a substantial cost benefit compared to other virtualization platforms not recognized by Oracle.

  7. Question 7

    A company needs to migrate a 5TB AIX database from their on-premises Power8 server to a Power Virtual Server instance. The primary business requirement is to minimize application downtime to less than one hour. The company has a 10 Gbps Direct Link connection. Which migration method is most suitable to meet this downtime requirement?

    Answer and explanation

    Correct answer: C

    This method allows for a near-zero downtime migration. The data can be replicated in the background while the source system is online. During the cutover window, a final synchronization is performed, the application is stopped, and services are started on the target PowerVS instance. This entire cutover process can be accomplished in under an hour.

  8. Question 8

    An administrator is deciding between a shared and a dedicated processor pool for a new Power Virtual Server instance that will run a performance-sensitive, licensed software product. The software license is tied to the number of processor cores. What is the primary trade-off between using a shared uncapped processor pool versus a dedicated processor pool in this scenario?

    graph TD subgraph On-Premises App[Licensed App] end subgraph PowerVS A[Shared Pool LPAR] B[Dedicated Pool LPAR] end App -->|Migrate to| A App -->|Migrate to| B A -- "Cost vs Performance" --> C{Decision} B -- "Cost vs Performance" --> C
    Answer and explanation

    Correct answer: A

    This accurately describes the trade-off. A shared uncapped pool allows the LPAR to use spare CPU cycles from the pool, which is cost-effective and flexible. However, performance can fluctuate as other LPARs contend for those spare cycles. A dedicated pool reserves physical cores for the LPAR, guaranteeing consistent performance at a higher cost.

  9. Question 9

    When deploying a high-availability solution for an AIX application using PowerHA SystemMirror across two Power Virtual Server instances in the same data center, what is a critical network configuration requirement for the cluster heartbeat?

    Answer and explanation

    Correct answer: B

    PowerHA best practices strongly recommend network redundancy and isolation. A dedicated private subnet should be used exclusively for the cluster heartbeat communication (via unicast or multicast) to prevent service traffic or replication traffic from interfering with the cluster's ability to detect node failures, which could lead to a false failover (split-brain scenario).

  10. Question 10

    Multiple answers

    A security administrator is tasked with hardening a new IBM i instance on Power Virtual Server to meet corporate compliance standards. The standards require data-at-rest encryption using company-managed keys and strict network access control. Which IBM Cloud services must be configured to meet these requirements? (Select TWO)

    Answer and explanation

    Correct answers: A, B

    IBM Key Protect is the service used to create and manage encryption keys. When integrated with PowerVS, it allows customers to 'Bring Your Own Key' (BYOK) for encrypting storage volumes, ensuring they maintain control over their data encryption.

    Power Virtual Server does not use IBM Cloud Security Groups. Network access control must be implemented at the OS level (e.g., using IP packet filtering rules in IBM i) or by using an external network appliance like a virtual firewall.

Register free to unlock 10 more sample questions

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 199 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at

NvidiaSupabaseGitHubOpenAITursoClerkClaude AIAmazon