Why Study with PlanetCert?
The Latest Questions
Practice questions and exam topics aligned with the current exam objectives.
Detailed Explanations
Go beyond the answer. Master the material with comprehensive learning and professional explanations for every concept.

AI-Powered Insights
Personalized preparation guidance that adapts to your performance and identifies weak spots automatically.
Exam Information
Official specifications published by Blue Prism
Exam Format
Registration
Validity
Skills this practice test covers
- Model application screens in Application Modeller and pick the right spy mode.
- Add wait stages so an object acts only when the screen is ready.
- Build processes from templates with work queues, Data Items and Collections.
- Handle exceptions with blocks, retry loops, and recovery and resume logic.
- Keep logins in Credential Manager and share applications safely with environment locks.
- Run, schedule and release a process with the Control Room, Scheduler and Release Manager.
Explore related topics
DEV01 exam content
4 domains · 0 topics · 440 questions
Object Development
Objects are the part of a Blue Prism solution that works with applications. Candidates build them to the best practice design standard, model screen elements in Application Modeller, pick a spy mode for each technology and add wait stages before an object acts.
Skills tested
- Create standard action types that follow the best practice design standard.
- Organize and label objects, pages and elements consistently.
- Choose a spy mode, such as HTML, Java, Region or Active Accessibility mode, for each application.
- Build wait stages with sensible timeouts so actions start only when elements are ready.
- Reuse existing objects, pages and sub-pages instead of building new ones.
Process Development
Processes hold the business logic and call objects for the screen work. This domain covers templates, work queues, credentials, environment variables, loops, stop controls, environment locks, pre-built skills and exception handling.
Skills tested
- Build work queues and use actions such as Get Next Item, Mark Complete and Mark Exception.
- Store logins in Credential Manager and settings in environment variables.
- Build Choice, Decision and Calculation stages with Data Items and Collections in the Expression Editor.
- Handle exceptions with exception blocks, retry loops, and recovery and resume logic.
- Add stop controls and environment locks so processes end safely and share resources.
Process Implementation
This domain takes a finished process toward production. Candidates test and debug it, run it from the Control Room, set stage logging, configure schedules and package it with Release Manager.
Skills tested
- Test actions and processes, and step through them with breakpoints when they fail.
- Run a process in the Control Room and solve the errors it reports.
- Choose stage logging settings that keep useful detail in the session logs.
- Configure a schedule that runs a process in production.
- Create a release file in Release Manager.
Best Practice
The smallest domain checks that a developer follows Blue Prism's best practice principles. It also asks which documents guide automation development, such as solution design documents.
Skills tested
- Apply best practice principles when designing processes and objects.
- Identify the documents to follow during automation development, such as solution design documents.
Requirements
- No formal prerequisites.
- Recommended: the Developer Learning Plan from SS&C Blue Prism.
- Recommended: three months of hands-on automation development in Blue Prism.
About the DEV01 exam
The Blue Prism Developer exam checks that a developer can build business objects and processes in Blue Prism to its design standards, then test, run and schedule them. Its target candidates are developers, lead developers, technical support staff and process analysts in Blue Prism environments. SS&C Blue Prism's handbook splits the content into Object Development, Process Development, Process Implementation and Best Practice, and the first two carry most of the weight. Passing earns the Blue Prism Accredited Developer certification.
Process Development gets the most questions in the DEV01 practice test, and exception handling is its largest topic. The explanations follow what each stage does when a process runs, which helps with work queue actions and environment locks. Study Mode suits Object Development, where spy modes and Application Modeller attributes need a careful read. Brainy AI Assistant can explain why a wait stage timed out, or how Get Next Item keeps two sessions from working the same item.
How to earn the certification
- Earns
- Blue Prism Accredited DeveloperProfessional
How to prepare for DEV01
- 1
Complete the Developer Learning Plan
SS&C Blue Prism's Developer Learning Plan at Blue Prism University teaches the skills this exam checks, from process templates and credentials to work queues and the Scheduler. Finish it before timed practice.
- 2
Build objects in Learning Edition
Install the free Blue Prism Learning Edition and automate a small web or desktop app. Model its screens in Application Modeller and try more than one spy mode on the same element.
- 3
Make a process fail on purpose
Add exception blocks and a retry loop, then break the application and watch which stage catches the error. Exception handling has the most practice questions in Process Development.
- 4
Run the process as production would
Start the process from the Control Room, read its session log, add a schedule and package it in Release Manager. These tasks make up Process Implementation.
- 5
Practise by domain, then run a full test
Work through the DEV01 practice test one domain at a time in Study Mode, then take a full run in Timed Mode. Ask Brainy AI Assistant about any stage that behaved in an unexpected way.
Start a timed DEV01run
SS&C Blue Prism's Developer Learning Plan at Blue Prism University is the official preparation for this exam.
Who DEV01 is for
- RPA developers who build objects and processes in Blue Prism.
- Lead developers who review automations against the design standard.
- Technical support staff who run processes in the Control Room and solve process errors.
- Process analysts and ROM architects who need a developer's view of Blue Prism.
Typical job titles: RPA developer · Blue Prism developer · Lead developer · Technical support analyst · Process analyst
DEV01 glossary
18 terms from the exam objectives and the vendor's official material, each defined in a sentence.
- Application Modeller
- The Blue Prism tool that identifies an application's screen elements and stores the attributes used to find them again.
- Collections
- Stages that hold a table of values in named fields and rows, which a process can loop through.
- Control Room
- The part of Blue Prism where processes are started, watched and stopped on runtime resources.
- Credential Manager
- The secure store for usernames, passwords and other secrets that processes use to log in to applications.
- Data Items
- Stages that hold a single value, such as text, a number or a date, for use in a process or object.
- Environment Locks
- Locks that let only one session at a time use a shared resource, such as a single-user application.
- Environment variables
- Values set once for the whole Blue Prism environment, such as a file path, that every process can read.
- Exception blocks
- Areas drawn around stages to catch the exceptions those stages raise, so they can be handled in one place.
- Expression Editor
- The editor for building calculations and conditions from Data Items, functions and operators.
- Get Next Item
- The work queue action that takes the next available item and locks it, so no other session works on it.
- Process Templates
- Ready-made starting designs that give every new process the same structure and standard parts.
- Release Manager
- The Blue Prism tool that packages processes, objects and other items into a release file for another environment.
- Retry loops
- Logic that tries a failed step again a set number of times before treating the error as an exception.
- Scheduler
- The Blue Prism feature that runs processes at set times or intervals without a person starting them.
- Spy modes
- The methods Blue Prism uses to identify screen elements, such as HTML, Java, Region and Active Accessibility mode, each suited to a type of application.
- Stage logging
- A setting on each stage that decides whether that step is written to the session log.
- Wait stages
- Stages that pause an object until a screen element appears or a condition is met, or until a timeout passes.
- Work queues
- Shared lists of work items that processes take one at a time, with the status of each item recorded.