Nutanix Certified Professional Multicloud Infrastructure 6.10 Free Sample Questions

Create a free account to browse all 20 sample questions. The full practice test includes 245 questions. Use the simulator for timed and flashcard mode.

Try Simulator

NCP-MCI-6-10 Sample Questions

  1. Question 1

    Q1

    A financial services company is deploying a new AHV cluster and must ensure that back-end storage traffic between CVMs is physically isolated from guest VM traffic and management traffic for security compliance. The network switches are already configured with separate, non-routable VLANs for this purpose.

    Which Nutanix feature must the administrator configure on each node to meet this requirement?

    Show answer & explanation

    Correct answer: B

    CVM Network Segmentation is the feature designed specifically to isolate CVM back-end storage traffic onto a separate VLAN and physical network interface. This directly addresses the requirement for physical traffic separation for compliance. Flow Microsegmentation provides logical, stateful firewalling between VMs but does not physically separate the CVM back-end traffic. Creating a new bridge or bond is part of the process, but Network Segmentation is the overarching feature that orchestrates this configuration.

  2. Question 2

    Q2

    An administrator is designing a multi-site disaster recovery solution for a critical 3-tier application. The primary site is in New York and the secondary site is in London. Due to the high latency (>100ms) between sites, synchronous replication is not feasible. The business requires an RPO of less than 15 minutes.

    Which Nutanix data protection technology should be used to meet these requirements?

    Show answer & explanation

    Correct answer: C

    NearSync replication is designed for low-RPO scenarios (1 to 15 minutes) over long-distance, high-latency links where synchronous replication is not viable. It meets the business requirement of a sub-15-minute RPO. Metro Availability provides an RPO of zero but requires low latency (<5ms). Standard Asynchronous replication has a minimum RPO of 60 minutes. Cloud Connect is for replicating to a cloud target, not another physical site in this context.

  3. Question 3

    Q3Multiple answers

    A systems administrator is tasked with deploying a three-node scale-out Prism Central instance to manage a growing number of clusters. The deployment must be performed manually on an existing AHV cluster.

    Which three disk image files must be uploaded to the cluster's image service before creating the Prism Central VMs? (Select THREE)

    Show answer & explanation

    Correct answers: A, B, D

    A manual deployment of a Prism Central VM requires three separate disk image files: the boot disk, the home disk, and the data disk. These files contain the operating system, user data, and metadata/service data for the Prism Central instance, respectively. Swap space is managed within the OS and does not require a separate image file.

  4. Question 4

    Q4

    A consultant is performing a health check on a customer's 6-node hybrid cluster. The consultant notices that the Data Resiliency Status is Critical because one node has failed. The cluster is configured with Replication Factor 2. The consultant needs to explain the immediate impact to the customer.

    What is the current state of the cluster's data resiliency?

    Show answer & explanation

    Correct answer: C

    With Replication Factor 2, data is written in two copies across different nodes. When one node fails, the data that was on that node now only has one remaining copy on another node in the cluster. The cluster will immediately begin recreating the second copy, but until that process completes, that data is at risk. If another node or disk holding the single remaining copy fails during this time, data loss will occur. The cluster remains fully operational (read/write).

  5. Question 5

    Q5

    A new administrator is trying to understand the different alert severities in Prism Central. They want to create an X-Play playbook that automatically opens a ServiceNow ticket only for alerts that indicate a potential for data loss or a production outage.

    Which alert severity level should be used as the trigger for this X-Play playbook?

    Show answer & explanation

    Correct answer: C

    In Nutanix Prism, 'Critical' is the highest severity level for alerts. It signifies a serious issue that could lead to a production outage, data unavailability, or data loss. Therefore, to automate ticket creation for the most severe issues, the 'Critical' severity level should be used as the trigger in the X-Play playbook.

  6. Question 6

    Q6

    True or False: When using Nutanix Metro Availability with a Witness, the automatic failover process for a protected container will be initiated if the primary site's storage becomes unavailable, even if the network link between the primary and secondary sites also fails.

    Show answer & explanation

    Correct answer: A

    This is True. The Witness is designed to handle this specific split-brain scenario. If the secondary site can reach the Witness but the primary site cannot (due to a primary site failure), the Witness will instruct the secondary site to take ownership of the protected container. This ensures business continuity even during a complete primary site outage.

  7. Question 7

    Q7

    Case Study:

    A retail company runs its e-commerce platform on a 10-node all-flash Nutanix AHV cluster. During peak holiday sales, the database VMs, which are part of a resource-intensive MS SQL Server cluster, experience high CPU ready times and storage latency spikes. The application team requires that these database VMs are not impacted by other, less critical workloads like web and reporting servers running on the same cluster.

    The current configuration places all VMs in the same resource pool. The administrator needs to implement a solution that guarantees CPU and storage resources for the database VMs, preventing resource contention from other VMs. The solution must be dynamic and not rely on pinning VMs to specific hosts.

    Which approach should the administrator take to meet these requirements?

    Show answer & explanation

    Correct answer: D

    This is the most comprehensive and flexible solution. By categorizing the VMs and applying a QoS policy in Prism Central, the administrator can set a guaranteed number of CPU cycles (using CPU reservation) and a minimum IOPS value for the database VMs. This prevents resource starvation from 'bully' VMs without statically assigning them to hosts, thus maintaining cluster flexibility. Flash Mode is already active on an all-flash cluster, and reserving storage capacity doesn't guarantee performance. VM-Host affinity is too rigid and violates the 'not pinning VMs' requirement.

  8. Question 8

    Q8

    An administrator needs to perform a firmware upgrade on a single node within a 5-node cluster during a maintenance window. The administrator has already used LCM to perform the firmware inventory. The cluster is healthy and has sufficient resources to tolerate one node being down.

    What is the correct sequence of steps to take the node offline, perform the update, and bring it back into service?

    1. Use LCM to apply the firmware updates to the selected node.
    2. From the CVM of the target node, run cvm_shutdown -P now.
    3. In Prism Element, select the host and choose 'Enter Maintenance Mode'.
    4. After the update, select the host and choose 'Exit Maintenance Mode'.
    Show answer & explanation

    Correct answer: C

    The Life Cycle Manager (LCM) framework is designed to automate the entire upgrade process in a non-disruptive, rolling fashion. When an administrator initiates a firmware update through LCM, the framework automatically handles putting the node into maintenance mode, live-migrating VMs, shutting down the CVM if necessary, applying the updates, restarting services, and exiting maintenance mode before moving to the next node. Manual intervention as described in the other options is not required and circumvents the built-in safety and automation of LCM.

  9. Question 9

    Q9

    A new Nutanix cluster has been deployed with two 10GbE and two 1GbE NICs per node. The administrator has created a bond using the two 10GbE interfaces for all CVM and VM traffic. The two 1GbE interfaces are currently unused. The business wants to use the 1GbE interfaces for a dedicated, out-of-band backup network.

    What is the recommended method to configure the 1GbE interfaces for this separate network?

    Show answer & explanation

    Correct answer: C

    The correct and recommended approach for creating a logically and potentially physically separate network is to create a new virtual bridge (e.g., br1). This new bridge will then have its own bond (e.g., bond1) composed of the 1GbE physical NICs. VMs that require access to the backup network can then have a vNIC attached to a virtual network created on br1. This ensures complete separation from the primary br0 network. Adding NICs of different speeds to the same bond is not recommended, and adding a second bond to the same bridge does not provide the desired logical separation.

  10. Question 10

    Q10

    During a disaster recovery test, an administrator executes a 'Test Failover' for a recovery plan. Several VMs in the plan fail to power on at the recovery site, and the plan reports an error.

    What is a common reason for VMs to fail to power on during a 'Test Failover' operation?

    Show answer & explanation

    Correct answer: B

    A 'Test Failover' creates a temporary, isolated network bubble for the recovered VMs. The administrator must specify a test network (VLAN) in the recovery plan's network mappings. If this specified VLAN does not exist or is not configured on the hosts at the recovery site, the VMs cannot be attached to a network and will fail to power on. While replication issues can cause failures, a missing test network is a very common and specific cause for this symptom during a test failover.

Register free to unlock 10 more sample questions

Create a free account to continue with the rest of the NCP-MCI-6-10 sample set.

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 245 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at

NvidiaSupabaseGitHubOpenAITursoClerkClaude AIAmazon