  1. Question 1

    A financial services company is implementing a new automated deployment pipeline. The key practice success factor (PSF) is to 'ensure successful deployments'. Which metric provides the most direct and effective measure of this specific PSF?

    Answer and explanation

    Correct answer: B

    The change failure rate is the most direct measure of deployment success. It calculates the percentage of deployments that result in a degradation of service or require remediation (e.g., a hotfix, rollback, or patch). While deployment frequency measures speed and lead time for changes measures efficiency, the change failure rate specifically quantifies the quality and success of the deployments themselves.

  2. Question 2

    During the deployment of a new e-commerce feature, a critical performance issue is discovered in the production environment that was not caught in staging. The deployment team needs to revert the system to its last known good state immediately. Which deployment management activity is being executed?

    Answer and explanation

    Correct answer: C

    Remediation involves the actions taken to recover after a failed deployment. This includes executing a rollback or back-out plan to restore the service to a functional state. Deployment verification is the testing done after deployment, phased deployment is a deployment strategy, and deployment authorization is a preceding step.

  3. Question 3

    Multiple answers

    A DevOps team is adopting a blue-green deployment model for its primary customer-facing application. Which of the following are key prerequisites for this model to be successful? (Select TWO)

    Answer and explanation

    Correct answers: A, B

    Blue-green deployment relies on two identical production environments: 'blue' (current live) and 'green' (new version). Success hinges on the ability to create this identical 'green' environment quickly (often via Infrastructure as Code) and a reliable mechanism (like a load balancer or router) to switch traffic from blue to green. Manual testing and separate release schedules are important for the overall process but are not the core technical prerequisites for the blue-green mechanism itself.

  4. Question 4

    True or False: The scope of Deployment Management is strictly limited to moving components into the live production environment and does not concern pre-production environments like testing or staging.

    Answer and explanation

    Correct answer: B

    According to ITIL 4, the Deployment Management practice is responsible for moving new or changed components to ALL environments, including live production, testing, and staging. A consistent and controlled deployment process across all environments is crucial for ensuring quality and reducing risks.

  5. Question 5

    A healthcare provider is deploying a major update to its Electronic Health Record (EHR) system. Due to the critical nature of the system and the need for clinicians to be trained on the new interface, the organization decides to deploy the new version to one hospital department at a time over a period of three months. What deployment approach is being used?

    Answer and explanation

    Correct answer: C

    Phased deployment is an approach where the new service or component is deployed to a subset of users or environments first, and then gradually rolled out to the rest. Deploying department by department is a classic example of a phased approach based on user groups. This allows for focused training, feedback collection, and risk mitigation.

  6. Question 6

    An organization's Deployment Management practice has a low maturity level. Deployments are frequently delayed, cause incidents, and require significant manual effort. According to the ITIL 4 maturity model, what is the most logical FIRST step to improve the practice's capability?

    Answer and explanation

    Correct answer: B

    According to the ITIL maturity model, foundational steps (Level 1 to 2) involve establishing basic, repeatable processes and defining roles and responsibilities. Before investing heavily in automation (a characteristic of higher maturity levels), the organization must first address the lack of a standardized process. Documenting the process and clarifying roles provides the necessary foundation upon which further improvements, like automation, can be built.

  7. Question 7

    A deployment manager is preparing to deploy a new software component provided by a third-party supplier. The supplier has provided the component but no installation instructions or test results. Which ITIL practice is primarily responsible for ensuring that suppliers meet their contractual obligations for providing necessary documentation and support?

    Answer and explanation

    Correct answer: C

    The Supplier Management practice is responsible for ensuring that the organization's suppliers and their performances are managed appropriately to support the seamless provision of quality products and services. This includes ensuring that suppliers deliver all agreed-upon components, documentation, and support as stipulated in their contracts. The Deployment Manager would collaborate with Supplier Management to resolve this issue.

  8. Question 8

    Case Study

    A retail company, 'StyleStream', is moving from a monolithic e-commerce platform to a container-based microservices architecture. Their current deployment method involves a monthly 'big bang' release, which causes significant downtime and high risk. The goal is to enable individual development teams to deploy their microservices independently and frequently with zero downtime.

    The IT leadership team has mandated that the new deployment strategy must support rapid, independent deployments while minimizing the 'blast radius' of any potential failures. The operations team is small and requires a high degree of automation to manage the new, complex environment. They use a CI/CD pipeline built on Jenkins and Ansible, and service configuration information is stored in a CMDB.

    The Deployment Manager has been tasked with proposing a new deployment model that aligns with these strategic goals. The solution must address how new code is introduced to production, how failures are handled, and how the CMDB is kept accurate during these frequent, automated deployments.

    Which approach BEST meets StyleStream's requirements?

    Answer and explanation

    Correct answer: B

    This approach directly addresses all requirements. A canary release model is ideal for microservices as it allows independent deployment and limits the blast radius by exposing new code to a small subset of users first. Automating this via the CI/CD pipeline meets the operations team's needs. Critically, integrating the pipeline with the CMDB via an API ensures configuration data remains accurate despite frequent changes, which is a key challenge in such dynamic environments.

  9. Question 9

    The Deployment Manager role is being formally established in an organization. What is the PRIMARY responsibility of this role?

    Answer and explanation

    Correct answer: C

    The primary responsibility of the Deployment Manager is to establish and maintain the overall capability to deploy components successfully. This includes defining processes, selecting tools, and overseeing the execution of deployments to ensure they are efficient, reliable, and controlled. Approving changes is the role of a change authority, and bundling changes is part of Release Management.

  10. Question 10

    A team is designing a deployment plan for a service update. The plan includes steps for pre-deployment checks, deploying the files, configuring the application, and post-deployment testing. According to ITIL, which guiding principle is MOST relevant to ensuring the plan is effective and efficient?

    Answer and explanation

    Correct answer: C

    'Think and work holistically' is the most relevant principle. A deployment plan must consider the entire system and its dependencies. This includes not just copying files, but also performing pre-checks, handling configurations, and conducting post-deployment verification. This holistic view ensures that all aspects of the service delivery are considered, leading to a successful outcome.

Register free to unlock 10 more sample questions

Lifetime One

Own this practice test forever.

$79.99
$75.99
one-time
  • Full access to 209 questions
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • Brainy AI Assistant
  • Lifetime updates

Two

Any 2 exams per month.

$20.00/exam
$39.99
/month
  • 2 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 1,000 Brainy AI Credits
  • Cancel anytime

Premium Twelve

Any 12 exams over 3 months.

$15.00/exam
$179.99
/3 months
  • 4 active exam slots
  • Study, Timed & Flashcard Modes
  • All past and future versions i
  • Detailed Explanations
  • Study Tracking & Past Attempts
  • 15,000 Brainy AI Credits
  • Dedicated support
  • Friend seat included — full access

Trusted by professionals at

NvidiaSupabaseGitHubOpenAITursoClerkClaude AIAmazon