Why Study with PlanetCert?
The Latest Questions
Practice questions and exam topics aligned with the current exam objectives.
Detailed Explanations
Go beyond the answer. Master the material with comprehensive learning and professional explanations for every concept.

AI-Powered Insights
Personalized preparation guidance that adapts to your performance and identifies weak spots automatically.
Exam Information
Official specifications published by Scrum
Exam Format
Registration
Validity
Skills this practice test covers
- Write a Definition of Workflow that names the work items, the workflow states and the explicit policies.
- Set WIP limits that create a pull system, and adjust them from flow data.
- Track Work Item Age to find blocked or aging items during the Sprint.
- Use Little's Law to explain how WIP, Cycle Time and Throughput affect each other.
- Create a Service Level Expectation and use it in the Daily Scrum.
- Choose the right flow metric for Sprint Planning, the Sprint Review and the Sprint Retrospective.
Explore related topics
PSK-I exam content
3 domains · 12 topics · 252 questions
Kanban Practices
This domain covers the four practices that the Kanban Guide for Scrum Teams adds to Scrum. Candidates define the workflow, limit work in progress, manage items as they move, and adapt the workflow when the data shows a problem.
Skills tested
- Build a Kanban board from the Definition of Workflow, with clear workflow states.
- Set WIP limits that create a pull system, then tune them to team capacity.
- Find blocked items and aging work during daily work, and act on them.
- Inspect and adapt the Definition of Workflow without losing stability.
Official topics
- Visualizing Workflow
- Limiting Work in Progress (WIP)
- Active Work Management
- Inspecting and Adapting Workflow
Agile Metrics and Flow
This domain is about measuring flow. Candidates use the four flow metrics, apply Little's Law, and set a Service Level Expectation that tells stakeholders how predictable delivery is.
Skills tested
- Measure WIP, Cycle Time, Work Item Age and Throughput, and tell leading from lagging indicators.
- Predict with Little's Law how Cycle Time changes when WIP changes.
- Build a Service Level Expectation from historical Cycle Time data.
- Use Throughput-based forecasting to discuss what a Sprint can deliver.
Official topics
- Core Flow Metrics
- Little's Law
- Service Level Expectation (SLE)
- Metrics in Scrum Events
The Scrum Framework with Kanban
This domain checks that Kanban strengthens Scrum instead of replacing it. Candidates connect Kanban to Scrum's accountabilities, events, artifacts and values, and use empirical process control to guide each change.
Skills tested
- Explain how Sprint Planning, the Daily Scrum, the Sprint Review and the Sprint Retrospective use flow data.
- Link Kanban practices to Scrum values such as focus, openness and courage.
- Recognize integration pitfalls such as over-optimization and resistance to change.
- Use transparency, inspection and adaptation to make data-driven changes.
Official topics
- Scrum Fundamentals
- Scrum Values and Kanban
- Integration Patterns
- Empirical Process Control
Requirements
- No formal prerequisites.
- Recommended: Scrum knowledge at the level of Professional Scrum Master I and experience working on a Scrum Team.
- Recommended: a careful reading of the Scrum Guide and the Kanban Guide for Scrum Teams, plus some familiarity with Kanban concepts.
About the PSK-I exam
PSK-I is the Scrum.org exam for Scrum Team members who use Kanban to manage the flow of work. Its source is the Kanban Guide for Scrum Teams. In that guide, Kanban adds practices to Scrum but leaves its events, artifacts and accountabilities unchanged. The questions cover the four Kanban practices, the four flow metrics with Little's Law, and the Service Level Expectation. Passing earns the Professional Scrum with Kanban I certification, which does not expire.
The PlanetCert practice test has the most questions on Agile Metrics and Flow, with many on Little's Law, Cycle Time and Work Item Age. The explanations are most useful where the metrics interact, for example why Cycle Time grows when WIP rises while Throughput stays the same. Study Mode suits Kanban Practices, where questions on WIP limits and the Definition of Workflow turn on exact wording. Brainy AI Assistant can work through a Little's Law calculation or explain which metric fits the Daily Scrum.
How to earn the certification
- Earns
- Professional Scrum with Kanban I (PSK I)Foundation
The certification is valid for life and needs no renewal.
- Before
- PSM I Professional Scrum Master I
Recommended first. PSK-I assumes Scrum knowledge at this level.
- PSM I Professional Scrum Master I
- After
- PSM II Professional Scrum Master II
Scrum.org's advanced Scrum Master exam, a common next step for Scrum Masters.
- PSPO-II Professional Scrum Product Owner II
The advanced Product Owner exam, for those who manage product value and stakeholders.
- PSM II Professional Scrum Master II
How to prepare for PSK-I
- 1
Read both guides side by side
Read the Scrum Guide first and then the Kanban Guide for Scrum Teams. Mark each place where a Kanban practice touches a Scrum event or artifact.
- 2
Write a sample Definition of Workflow
Pick a real or invented team and write its Definition of Workflow: the work items, the start and finish points, the workflow states, the WIP limits and the policies. Then draw it as a Kanban board.
- 3
Work Little's Law with numbers
Agile Metrics and Flow has the most practice questions. Compute Cycle Time from WIP and Throughput for a few cases, and note which way each metric moves when another one changes.
- 4
Match each metric to an event
For every Scrum event, name the flow metrics that help it, such as the Service Level Expectation in the Daily Scrum. Check each choice against the Kanban Guide for Scrum Teams.
- 5
Close with timed practice runs
Take the PSK-I practice test in Timed Mode once each domain is clear. Review every missed question, and ask Brainy AI Assistant to explain why the right answer fits the guide.
Start a timed PSK-Irun
Scrum.org's official course for this exam is the Professional Scrum with Kanban training.
Who PSK-I is for
- Scrum Masters who want their teams to deliver with steadier, more predictable flow.
- Developers and Product Owners on Scrum Teams that track their work on a Kanban board.
- Coaches and team leads who introduce flow metrics to the teams they support.
- Project managers moving to agile work who want a measurable view of progress.
Typical job titles: Scrum Master · Agile coach · Product Owner · Team lead · Agile project manager
PSK-I glossary
17 terms from the exam objectives and the vendor's official material, each defined in a sentence.
- Active Work Management
- Managing work items while they are in progress, so that none gets blocked or ages without anyone acting.
- Cycle Time
- The elapsed time between when a work item starts and when it finishes.
- Definition of Workflow
- The Scrum Team's explicit, shared understanding of its workflow: where work starts and finishes, the states between, how WIP is limited, and the policies for each step.
- Empirical process control
- Making decisions from what is actually observed, through transparency, inspection and adaptation.
- Explicit policies
- Written rules, agreed by the team, that say how work items move through each state of the workflow.
- Flow metrics
- The four key measures of how work moves through a workflow: WIP, Cycle Time, Work Item Age and Throughput.
- Kaizen
- A Japanese term for continuous improvement through many small, steady changes.
- Kanban board
- A visual board that shows each work item moving through the team's workflow states.
- Lagging indicator
- A measure that describes results only after the work has finished.
- Leading indicator
- A measure that warns of a problem while work is still in progress, before the result is known.
- Little's Law
- The rule that average Cycle Time equals average WIP divided by average Throughput, so more WIP at the same Throughput means longer Cycle Times.
- Pull system
- A way of working in which new work starts only when there is capacity for it, instead of being pushed in on a schedule.
- Service Level Expectation (SLE)
- A forecast of how long a single work item should take from start to finish, given as a period of time with a probability.
- Throughput
- The number of work items finished per unit of time, such as per day or per Sprint.
- WIP limits
- Caps on how many work items may be in progress at once, so the team finishes work before it starts more.
- Work in Progress (WIP)
- The work items that have started but have not yet finished.
- Work Item Age
- The elapsed time between when a work item started and the current time, measured for items still in progress.