Why Study with PlanetCert?
The Latest Questions
Practice questions and exam topics aligned with the current exam objectives.
Detailed Explanations
Go beyond the answer. Master the material with comprehensive learning and professional explanations for every concept.

AI-Powered Insights
Personalized preparation guidance that adapts to your performance and identifies weak spots automatically.
Exam Information
Official specifications published by Six Sigma
Exam Format
Registration
Validity
Skills this practice test covers
- Write a business case, problem and goal statements, and a project scope for a Lean Six Sigma project.
- Run a Gage R&R study and decide whether a measurement system can be trusted.
- Calculate Cp and Cpk and judge whether a process is capable.
- Choose a hypothesis test for normal or non-normal data and read its result.
- Design a full or fractional factorial experiment and interpret its effects and interactions.
- Select the control chart that fits the data, then write the control plan and response plan.
Explore related topics
ICBB exam content
5 domains · 52 topics · 193 of 209 questions sorted by domain
Define Phase44 questions
The Define phase frames the project before data is collected. It covers what Six Sigma means, the roles in a project, the voice of the customer, the cost of poor quality, project selection and the lean view of waste.
Skills tested
- Translate the voice of the customer into Critical to Quality characteristics.
- Express a problem as Y = f(x), with the output as a function of its inputs.
- Rank problems with Pareto analysis and measure the cost of poor quality.
- Write the business case, the problem and goal statements, and the project scope.
- Find the types of waste with lean principles and a value stream map.
Questions by topic
- Problem and Goal Statements4
- Voice of the Customer (VOC)4
- Defining a Process4
- Basic Six Sigma Metrics1
- Pareto Analysis (80:20 rule)2
- Value Stream Mapping4
- Critical to Quality Characteristics (CTQ's)3
- Cost of Poor Quality (COPQ)5
- Types of Waste5
- Selecting Lean Six Sigma Projects7
- Lean Principles3
- Cause & Effect / Fishbone Diagrams1
- Process Definition1
Measure Phase41 questions
The Measure phase describes the process and checks the numbers. Candidates map the process, list possible causes with fishbone diagrams, X-Y diagrams and FMEA, test the measurement system, and measure process capability.
Skills tested
- Map a process with SIPOC and a value stream map.
- Rank failure risks with Failure Modes & Effects Analysis (FMEA).
- Summarize data with descriptive statistics and check it for normality.
- Assess precision, accuracy, bias, linearity and stability with Gage R&R and attribute MSA.
- Calculate capability for variable and attribute data, after checking stability.
Questions by topic
- Measurement System Analysis (MSA)10
- Process Mapping4
- Capability Analysis4
- Failure Modes & Effects Analysis (FMEA)4
- Cause & Effect / Fishbone Diagrams1
- Descriptive Statistics4
- Non-Normal Distributions3
- Process Capability6
- Process Definition2
- Basic Six Sigma Metrics3
Analyze Phase41 questions
The Analyze phase uses data to find root causes. Candidates separate common cause from special cause variation, apply inference and the Central Limit Theorem, and choose hypothesis tests for normal and non-normal data.
Skills tested
- Distinguish common cause variation from special cause variation.
- Explain the Central Limit Theorem and pick a sampling technique.
- Set up hypotheses and weigh alpha risk against beta risk.
- Run t-tests, one-sample variance tests and one-way ANOVA on normal data.
- Apply Mann-Whitney, Kruskal-Wallis, Mood's Median and other tests for non-normal data.
Questions by topic
- Hypothesis Testing with Non-Normal Data6
- Central Limit Theorem3
- One Way ANOVA3
- Hypothesis Testing7
- Inferential Statistics7
- Risk; Alpha & Beta3
- Significance; Practical vs. Statistical4
- Multiple Regression Analysis2
- Hypothesis Testing with Normal Data3
- Patterns of Variation2
- Cause & Effect / Fishbone Diagrams1
Improve Phase34 questions
The Improve phase models the process and tests changes before they go live. Candidates build simple and multiple regression models, check residuals, and design full and fractional factorial experiments.
Skills tested
- Fit a regression equation and check its residuals.
- Use confidence and prediction intervals, and transform data with Box Cox.
- Plan a designed experiment with clear objectives and design considerations.
- Analyze a 2k full factorial design for main effects and interactions.
- Choose a fractional design and explain its confounding and resolution.
Questions by topic
- Designed Experiments (DOE)3
- Simple Linear Regression3
- Fractional Factorial Experiments4
- Residuals Diagnostics3
- Experimental Resolution5
- Solution Selection5
- Lean Improvement Techniques4
- Full Factorial Experiments3
- Multiple Regression Analysis4
Control Phase33 questions
The Control phase keeps the gains. Candidates apply lean controls such as 5S, Kanban, Poka-Yoke and standard work, run statistical process control, and write the control plan and the response plan.
Skills tested
- Error-proof a process step with Poka-Yoke.
- Organize a workplace with the 5S System and pull work with Kanban.
- Select variable or attribute control charts and read their patterns.
- Write a control plan and a response plan, backed by a cost benefit analysis.
Questions by topic
- Elements of the Response Plan4
- 5S System4
- Poka-Yoke7
- Control Chart Analysis3
- Kanban3
- Six Sigma Control Plans3
- Attribute Control Charts2
- Statistical Process Control (SPC)5
- Lean Controls2
Requirements
- No formal prerequisites: anyone can book the exam.
- Recommended: at least three years in process improvement, with experience leading projects.
- Recommended: a Black Belt training course from an accredited provider.
- Recommended: a strong grounding in statistics, and the IASSC Certified Lean Six Sigma Green Belt first.
About the ICBB exam
ICBB is the IASSC Black Belt exam, and it asks which Lean Six Sigma tool fits each step of a DMAIC project (Define, Measure, Analyze, Improve, Control). The tools run from Pareto analysis in the Define phase to control charts in the Control phase. The statistics go deep: Gage R&R studies, capability indices, tests for non-normal data, multiple regression and fractional factorial experiments. A pass brings the IASSC Certified Black Belt (IASSC-CBB) certification, which lasts three years.
All five DMAIC phases appear in the PlanetCert practice test, and its largest single topic is Measurement System Analysis. A t-test and a Mann-Whitney test, or an I-MR chart and a c-chart, can both look right, and the explanations show which data fits each one. The lean tools of the Control phase, from 5S to Poka-Yoke, work well as a Flashcard Mode drill. Brainy AI Assistant can suggest the hypothesis test for a described data set, or show why a fractional design confounds two effects.
How to earn the certification
- Earns
- IASSC Certified Black Belt (IASSC-CBB)Black Belt
The IASSC Certified Black Belt is valid for three years.
- Before
- ICGB IASSC Certified Lean Six Sigma Green Belt
Recommended, not required. It covers the DMAIC basics that the Black Belt exam takes further.
- ICGB IASSC Certified Lean Six Sigma Green Belt
- After
- LSSMBB Lean Six Sigma Master Black Belt
The belt level above Black Belt, for those who go on to coach Black Belts and run improvement programs.
- CQE Certified Quality Engineer
ASQ's quality engineering certification, a fit for Black Belts who move into quality engineering.
- LSSMBB Lean Six Sigma Master Black Belt
How to prepare for ICBB
- 1
Map one real process end to end
Pick a process from work, draw its SIPOC and value stream map, and write down its CTQs and its cost of poor quality. The Define and Measure phases build on this picture.
- 2
Run each test on real data
Use a statistics package to run normality checks, t-tests, ANOVA and the tests for non-normal data on a sample data set. Note which assumption each test needs.
- 3
Prove the measurement system first
Do one Gage R&R study, then one Cp and Cpk calculation by hand. A capability figure means little until the measurement system has passed.
- 4
Design a small experiment
Plan a 2k full factorial design, then a half fraction of it, and list which effects the fraction confounds. Improve phase questions often turn on this trade-off.
- 5
Drill Control tools, then time it
Learn 5S, Kanban, Poka-Yoke and the control chart types in Flashcard Mode. A Timed Mode run of the ICBB practice test comes last, with Brainy AI Assistant on hand for any test choice that went wrong.
Start a timed ICBBrun
Who ICBB is for
- Process improvement professionals who lead DMAIC projects and coach team members.
- Quality managers, quality engineers and manufacturing engineers.
- Operations managers in manufacturing, healthcare, financial services or IT.
- Consultants who run process improvement work for clients.
Typical job titles: Continuous improvement lead · Process improvement manager · Quality engineer · Quality manager · Operations manager · Operational excellence consultant
ICBB glossary
18 terms from the exam objectives and the vendor's official material, each defined in a sentence.
- 5S System
- A workplace method in five steps: Sort, Set in order, Shine, Standardize and Sustain.
- Alpha risk
- The chance of rejecting the null hypothesis when it is true: a false alarm, also called a Type I error.
- Beta risk
- The chance of missing a real difference by failing to reject a false null hypothesis, also called a Type II error.
- Box-Cox
- A transformation that makes non-normal data closer to normal, so that tests which assume normality can be used.
- Central Limit Theorem
- The rule that the means of large enough samples are close to normally distributed, whatever the shape of the original data.
- Confounding
- In a fractional factorial design, the mixing of two effects so that the experiment cannot tell them apart.
- Control limits
- Lines on a control chart, set from the process data, that mark the normal range of common cause variation.
- Cost of Poor Quality (COPQ)
- The money lost through defects and failures, from scrap and rework to warranty claims and lost customers.
- Cpk
- A capability index that compares the process spread with the nearer specification limit, so it also shows when the process is off center.
- Critical to Quality (CTQ)
- A measurable feature of a product or service that the customer cares about, such as delivery time.
- Failure Modes & Effects Analysis (FMEA)
- A method that lists the ways a process can fail and ranks each one by severity, occurrence and detection.
- Gage R&R
- Gage repeatability and reproducibility: a study of how much measurement variation comes from the instrument and how much from the people using it.
- Mann-Whitney
- A test for non-normal data that compares two independent groups by their ranks instead of their means.
- Pareto Analysis
- Ranking causes by how often they occur, on the 80:20 idea that a few causes create most of the problems.
- Poka-Yoke
- Error-proofing: designing a process step so that a mistake cannot happen or is caught at once.
- SIPOC
- A high-level process map that lists the Suppliers, Inputs, Process steps, Outputs and Customers.
- Special Cause Variation
- Variation from a specific, assignable source, such as a worn tool, which should be found and removed.
- Y = f(x)
- The idea that a process output (Y) depends on its inputs (x), so a better output comes from finding and controlling the key inputs.