Why Study with PlanetCert?
The Latest Questions
Practice questions and exam topics aligned with the current exam objectives.
Detailed Explanations
Go beyond the answer. Master the material with comprehensive learning and professional explanations for every concept.

AI-Powered Insights
Personalized preparation guidance that adapts to your performance and identifies weak spots automatically.
Exam Information
Official specifications published by Six Sigma
Exam Format
Registration
Validity
Skills this practice test covers
- Build a business case and project charter for a Lean Six Sigma project.
- Calculate DPU, DPMO, FTY and RTY, and rank causes with a Pareto chart.
- Name the seven elements of waste and apply the five steps of 5S.
- Map a process with SIPOC, a value stream map and a fishbone diagram.
- Check a measurement system with a Gage R&R study before trusting its data.
- Write a control plan and a response plan, and choose Kanban or Poka-Yoke controls.
Explore related topics
ICYB exam content
3 domains · 33 topics · 193 of 313 questions sorted by domain
Define Phase63 questions
This phase frames the project. Candidates explain what Six Sigma means and who does what, choose a project with a business case and charter, and learn the Lean view of waste.
Skills tested
- Explain the problem-solving strategy Y = f(x) and the Six Sigma roles and responsibilities.
- Turn the Voice of the Customer into Critical to Quality characteristics.
- Calculate DPU, DPMO, FTY and RTY, and estimate the Cost of Poor Quality.
- Draft a project charter with a problem statement, goal, scope and metrics.
- Spot the seven elements of waste and apply Sort, Straighten, Shine, Standardize and Self-Discipline.
Questions by topic
- 1.2.5 Basic Six Sigma Metrics5
- 1.4.5 5S6
- 1.3.1 Building a Business Case & Project Charter9
- 1.4.4 The Seven Elements of Waste7
- 1.1.4 The Problem Solving Strategy Y = f(x)4
- 1.2.4 Pareto Analysis (80:20 rule)6
- 1.2.3 Cost of Poor Quality (COPQ)4
- 1.3.3 Financial Evaluation & Benefits Capture5
- 1.1.6 Six Sigma Roles & Responsibilities4
- 1.1.5 Voice of the Customer, Business and Employee5
- 1.2.2 Critical to Quality Characteristics (CTQ’s)4
- 1.4.1 Understanding Lean3
- 1.1.3 Deliverables of a Lean Six Sigma Project1
Measure Phase85 questions
This phase describes the process and checks how well it performs today. It covers process maps and failure modes, basic statistics, measurement system analysis and process capability.
Skills tested
- Draw a fishbone diagram, a SIPOC and a value stream map for one process.
- Rate failure modes in an FMEA and link inputs to outputs in an X-Y Diagram.
- Describe data with the mean, median, range and variance, and check it for normality.
- Judge a gauge for precision, accuracy, bias, linearity and stability.
- Interpret capability for variable and attribute data, and tell a stable process from an unstable one.
Questions by topic
- 2.1.1 Cause & Effect / Fishbone Diagrams4
- 2.1.3 X-Y Diagram10
- 2.3.1 Precision & Accuracy5
- 2.1.2 Process Mapping, SIPOC, Value Stream Map10
- 2.4.1 Capability Analysis5
- 2.3.3 Gage Repeatability & Reproducibility12
- 2.1.4 Failure Modes & Effects Analysis (FMEA)4
- 2.2.4 Graphical Analysis4
- 2.4.2 Concept of Stability5
- 2.2.2 Descriptive Statistics5
- 2.2.1 Basic Statistics10
- 2.3.2 Bias, Linearity & Stability4
- 2.3.4 Variable & Attribute MSA4
- 2.2.3 Normal Distributions & Normality3
Control Phase45 questions
The last phase keeps the gains. Candidates choose Lean controls such as 5S methods, Kanban and Poka-Yoke, weigh costs against benefits, and write the control plan and the response plan.
Skills tested
- Sustain 5S with control methods such as audits and visual management.
- Set up a Kanban pull system for a work area.
- Design Poka-Yoke devices that prevent a mistake or detect it at once.
- Run a cost benefit analysis before adding a control.
- Write a control plan and a response plan with clear owners and escalation steps.
Questions by topic
- 3.2.3 Elements of the Response Plan10
- 3.1.3 Poka-Yoke (Mistake Proofing)5
- 3.1.2 Kanban7
- 3.1.1 Control Methods for 5S4
- 3.2.2 Elements of the Control Plan8
- 3.2.1 Cost Benefit Analysis11
Requirements
- No formal prerequisites: anyone can book the exam.
- Recommended: Lean Six Sigma training from a qualified institution, trainer or company program, though IASSC does not require it.
- Recommended: an understanding of basic statistics and some familiarity with quality management.
- Recommended: experience on a process improvement project.
About the ICYB exam
Team members on Lean Six Sigma projects take ICYB to show they know the basic tools of the Define, Measure and Control phases. IASSC describes a Yellow Belt as someone who serves on projects led by Green Belts or Black Belts, often part time, or who leads small projects. The Analyze and Improve phases are not part of the Yellow Belt Body of Knowledge. A pass earns the IASSC Certified Yellow Belt (IASSC-CYB) designation and a listing in the Official IASSC Certification Register.
The PlanetCert practice test leans toward the Measure Phase, where Gage Repeatability & Reproducibility, the X-Y Diagram, process mapping and basic statistics have the most questions. Each explanation shows the working behind an answer, for example how DPMO counts defects against every opportunity for a defect, not against units. Flashcard Mode suits the Define Phase vocabulary, from CTQ and COPQ to the seven wastes. Brainy AI Assistant can walk through a Pareto chart or explain what a failed Gage R&R study says about the data.
How to earn the certification
- Earns
- IASSC Certified Yellow Belt (IASSC-CYB)Yellow Belt
IASSC recognizes its Yellow Belt certification perpetually.
- After
- ICGB IASSC Certified Lean Six Sigma Green Belt
The next IASSC belt, for people who lead the improvement projects that Yellow Belts support.
- ICBB IASSC Certified Lean Six Sigma Black Belt
The IASSC belt above Green Belt, for practitioners who lead complex improvement projects.
- ICGB IASSC Certified Lean Six Sigma Green Belt
How to prepare for ICYB
- 1
Start from IASSC's topic list
IASSC's Yellow Belt Body of Knowledge names every topic in the Define, Measure and Control phases. Mark a topic as done only after explaining it aloud, without notes.
- 2
Work the metrics by hand
Calculate DPU, DPMO, FTY and RTY for small made-up data sets, and build one Pareto chart. The Define Phase questions expect these steps to be quick and exact.
- 3
Map a familiar process
Pick an everyday process, such as handling a customer order, and draw its SIPOC, value stream map and fishbone diagram. Then rate its inputs against its outputs in an X-Y Diagram.
- 4
Give measurement the most time
Measure Phase has more practice questions than either other phase. Study precision against accuracy, the parts of a Gage R&R study, and how to read a capability result.
- 5
Close with a timed run
Run the ICYB practice test in Timed Mode after all three phases are covered. Sort the missed questions by phase, and ask Brainy AI Assistant to rework the ones on control and response plans.
Start a timed ICYBrun
IASSC certifies but does not teach. It recommends Lean Six Sigma training from a qualified institution, trainer or company program, such as an IASSC Accredited Provider.
Who ICYB is for
- Quality and process improvement staff who serve on Lean Six Sigma project teams.
- Support staff who help Green Belts and Black Belts collect data and run project tasks.
- Newcomers to quality work in manufacturing, healthcare, finance or government who want a first belt.
Typical job titles: Quality team member · Process improvement associate · Quality assurance coordinator · Operations analyst
ICYB glossary
18 terms from the exam objectives and the vendor's official material, each defined in a sentence.
- 5S
- Sort, Straighten, Shine, Standardize and Self-Discipline: five steps that keep a workplace organized.
- Control Plan
- A document that lists each key measure, how and how often it is checked, and who acts when it drifts.
- Cost of Poor Quality (COPQ)
- The cost that poor quality adds to a process, such as scrap, rework, complaints and extra inspection.
- Critical to Quality Characteristics (CTQ's)
- The measurable features of a product or service that matter most to the customer, taken from the Voice of the Customer.
- DPMO (Defects Per Million Opportunities)
- A defect rate that counts defects against every chance for a defect, scaled to one million opportunities.
- Failure Modes & Effects Analysis (FMEA)
- A method that lists the ways a process can fail and rates each one for severity, occurrence and detection.
- FTY (First Time Yield)
- The share of units that pass a process step correctly the first time, without rework or scrap.
- Gage Repeatability & Reproducibility
- A study that splits measurement variation into the variation of the gauge itself and the variation between the people using it.
- Kanban
- A pull signal, often a card, that tells the step before to make or move more only when it is needed.
- Measurement System Analysis
- A set of checks that a measurement system gives accurate, precise and stable data before that data is used to judge a process.
- Pareto Analysis (80:20 rule)
- A ranking of causes by how often they occur, based on the idea that a few causes create most of the problems.
- Poka-Yoke (Mistake Proofing)
- A device or step that makes a mistake impossible, or makes it visible at once, so that defects do not move on.
- Response Plan
- The steps to take when a control shows a problem, including who acts and when to escalate.
- Seven Elements of Waste
- Overproduction, Correction, Inventory, Motion, Overprocessing, Conveyance and Waiting: work that adds no value.
- SIPOC
- A high-level process map that lists the Suppliers, Inputs, Process steps, Outputs and Customers.
- Value Stream Map
- A map of every step that material and information pass through, showing where time is lost to waste.
- Voice of the Customer
- What customers say they need, gathered and turned into requirements that a project can measure.
- X-Y Diagram
- A matrix that rates how strongly each process input (X) affects each output (Y), to show which inputs to study first.