Why Study with PlanetCert?
The Latest Questions
Practice questions and exam topics aligned with the current exam objectives.
Detailed Explanations
Go beyond the answer. Master the material with comprehensive learning and professional explanations for every concept.

AI-Powered Insights
Personalized preparation guidance that adapts to your performance and identifies weak spots automatically.
Exam Information
Official specifications published by Six Sigma
Exam Format
Registration
Validity
Skills this practice test covers
- Build a project charter with a business case, project metrics and an estimate of financial benefits.
- Map a process with SIPOC, a value stream map and a fishbone diagram, then rank risks with FMEA.
- Check a measurement system with a GR&R study before trusting its data.
- Choose and read a hypothesis test, from t-tests and ANOVA to Mann-Whitney and chi-squared.
- Fit simple and multiple regression models and check their residuals.
- Pick the right control chart, such as an I-MR or a P chart, and write a control plan.
Explore related topics
ICGB exam content
5 domains · 41 topics · 247 of 255 questions sorted by domain
Define Phase58 questions
The Define Phase frames the project. Candidates explain Six Sigma roles, link the problem to Y = f(x), capture the voice of the customer, and build a business case and project charter. It also introduces Lean, with the seven wastes and 5S.
Skills tested
- Describe the roles of Champions, Black Belts and Green Belts in a Six Sigma program.
- Turn the voice of the customer into Critical to Quality (CTQ) characteristics.
- Calculate the cost of poor quality and basic metrics such as DPMO and DPU.
- Write a project charter with a business case, project metrics and expected savings.
- Identify the seven elements of waste and apply 5S to a work area.
Questions by topic
- The Lean Enterprise2
- Pareto Analysis (80:20 rule)3
- Cost of Poor Quality (COPQ)4
- Selecting Lean Six Sigma Projects2
- The Problem Solving Strategy Y = f(x)4
- The Seven Elements of Waste8
- Defining a Process2
- 5S3
- Basic Six Sigma Metrics2
- Critical to Quality Characteristics (CTQ's)4
- Understanding Lean2
- Building a Business Case & Project Charter11
- Voice of the Customer, Business and Employee5
- Six Sigma Roles & Responsibilities2
- Cause & Effect / Fishbone Diagrams2
- Process Mapping, SIPOC, Value Stream Map2
Measure Phase49 questions
The Measure Phase describes the process and checks the data. Candidates map the process, summarize data with descriptive statistics, test the measurement system, and calculate how capable the process is.
Skills tested
- Map a process with SIPOC and a value stream map, and list causes on a fishbone diagram.
- Rate failure modes by severity, occurrence and detection in an FMEA.
- Run a gage repeatability and reproducibility study and judge the result.
- Check data for normality and calculate capability indices such as Cp and Cpk.
Questions by topic
- Failure Modes & Effects Analysis (FMEA)9
- Measurement System Analysis6
- Gage Repeatability & Reproducibility5
- Capability Analysis5
- Process Mapping, SIPOC, Value Stream Map10
- Attribute & Discrete Capability4
- Cause & Effect / Fishbone Diagrams1
- Process Capability2
- Basic Six Sigma Metrics3
- Basic Statistics2
- Graphical Analysis2
Analyze Phase50 questions
The Analyze Phase finds the causes behind the problem. Candidates study patterns of variation, apply inferential statistics and the central limit theorem, and choose hypothesis tests for normal and non-normal data.
Skills tested
- Use a multi-vari analysis to see where variation comes from.
- Explain alpha and beta risk, and practical versus statistical significance.
- Run one- and two-sample t-tests, one-way ANOVA and a test for equal variances on normal data.
- Choose non-parametric tests such as Mann-Whitney, Kruskal-Wallis and Mood's Median for non-normal data.
- Test proportions and contingency tables with chi-squared.
Official topics
- Patterns of Variation
- Inferential Statistics
- Hypothesis Testing
- Hypothesis Testing with Normal Data
- Hypothesis Testing with Non-Normal Data
Improve Phase46 questions
In this syllabus the Improve Phase is about regression. Candidates measure correlation, build simple and multiple regression models, and check the residuals before they trust a model.
Skills tested
- Calculate a correlation coefficient and explain why correlation does not prove causation.
- Build a regression equation and read its residuals.
- Use confidence and prediction intervals with a multiple regression model.
- Transform data with a Box-Cox transformation when a model needs it.
Official topics
- Simple Linear Regression
- Multiple Regression Analysis
Control Phase44 questions
The Control Phase keeps the gains. Candidates apply Lean controls such as 5S, Kanban and poka-yoke, run statistical process control charts, and write the control plan and response plan.
Skills tested
- Choose a control chart: I-MR, Xbar-R or Xbar-S for variable data, and P, NP, U or C for attribute data.
- Calculate control limits and read a chart for out-of-control signals.
- Prevent errors with poka-yoke (mistake proofing).
- Write a control plan and a response plan, backed by a cost benefit analysis.
Questions by topic
- Statistical Process Control (SPC)18
- Poka-Yoke (Mistake Proofing)5
- Elements of the Response Plan5
- Kanban4
- C Chart2
- Six Sigma Control Plans9
- 5S1
Requirements
- No formal prerequisites: anyone can book the exam.
- Recommended: a basic understanding of statistics and of quality management concepts.
- Recommended: some experience with process improvement, or earlier exposure to Lean or Six Sigma.
About the ICGB exam
IASSC's Green Belt exam (ICGB) tests whether a practitioner can carry a Lean Six Sigma project through Define, Measure, Analyze, Improve and Control, the five DMAIC phases. Much of it is applied statistics, from descriptive statistics and capability indices to hypothesis tests and regression. Lean tools sit beside the statistics, including the seven wastes, 5S, Kanban and poka-yoke. IASSC sets no prerequisites, so no completed project or work experience is needed to sit the exam. Passing earns the IASSC Green Belt certification, which IASSC recognizes without expiry.
Questions in the PlanetCert practice test are spread fairly evenly across the five phases, and statistical process control and multiple regression have the most. Each explanation works through the statistics behind the answer, for example why non-normal data call for Mood's Median or Kruskal-Wallis instead of ANOVA. For the Analyze Phase, Study Mode leaves time to choose the right test for each data set. Brainy AI Assistant can explain what a test result means or how Cp differs from Cpk.
How to earn the certification
- Earns
- IASSC Certified Lean Six Sigma Green BeltGreen Belt (intermediate)
IASSC recognizes the certification without expiry. Its current status lasts three years and can be kept up under IASSC's recertification policy.
- Before
- ICYB IASSC Certified Lean Six Sigma Yellow Belt
Optional. It covers the basics first, but the Green Belt exam does not require it.
- ICYB IASSC Certified Lean Six Sigma Yellow Belt
- After
- ICBB IASSC Certified Lean Six Sigma Black Belt
The Black Belt exam that follows the Green Belt, for practitioners who lead Six Sigma projects.
- ICBB IASSC Certified Lean Six Sigma Black Belt
How to prepare for ICGB
- 1
Rebuild the DMAIC roadmap
Write each phase on one page with its tools and its outputs, from the project charter in Define to the control plan in Control. This makes clear which tool belongs at which point.
- 2
Run the statistics in software
Work through descriptive statistics, capability, t-tests and regression in Minitab, JMP or Excel. The Analyze and Improve phases depend on reading that output correctly.
- 3
Sort the tests by data type
Group hypothesis tests by data type and normality: t-tests and ANOVA for normal data; Mann-Whitney, Kruskal-Wallis or Mood's Median for non-normal data; chi-squared for counts.
- 4
Match each chart to its data
Pair every control chart with the data it needs: I-MR for single readings, Xbar-R or Xbar-S for subgroups, P and NP for defectives, U and C for defects.
- 5
Test every phase under time
Take the ICGB practice test in Timed Mode, then review the missed questions phase by phase. Ask Brainy AI Assistant to explain any test result or control chart pattern that is still unclear.
Start a timed ICGBrun
Who ICGB is for
- Quality and process improvement staff who run improvement projects next to their regular work.
- Project and operations managers who want a structured way to reduce defects and variation.
- Manufacturing and healthcare quality professionals who analyze process data.
- IT professionals who work on process optimization.
Typical job titles: Quality engineer · Process improvement specialist · Operations manager · Project manager · Quality analyst · Continuous improvement lead
ICGB glossary
19 terms from the exam objectives and the vendor's official material, each defined in a sentence.
- 5S
- A Lean method for organizing a workplace: sort, set in order, shine, standardize and sustain.
- Alpha risk
- The risk of rejecting the null hypothesis when it is true, also called a Type I error.
- Beta risk
- The risk of failing to reject the null hypothesis when it is false, also called a Type II error.
- Box-Cox transformation
- A power transformation that brings non-normal data closer to normal, so that tests and models that assume normality can be used.
- Central Limit Theorem
- The rule that sample means tend toward a normal distribution as the sample size grows, whatever the shape of the data.
- Control Plan
- A document that lists what to measure, how often, and who acts when the process drifts, so that the gains last.
- Cost of Poor Quality (COPQ)
- The money lost through defects and failures, such as scrap, rework and returns, plus the cost of inspecting for them.
- Cpk
- A process capability index that compares the spread of a process with its specification limits and allows for an off-center mean.
- Critical to Quality (CTQ)
- A measurable characteristic of a product or process that the customer cares about, taken from the voice of the customer.
- DMAIC
- Define, Measure, Analyze, Improve and Control: the five phases of a Six Sigma improvement project.
- DPMO
- Defects per million opportunities: a standard Six Sigma measure of how often a process produces defects.
- Failure Modes & Effects Analysis (FMEA)
- A method that lists the ways a process can fail and ranks each one by severity, occurrence and detection.
- Gage Repeatability & Reproducibility
- A study of how much measurement variation comes from the gage itself and how much from the different operators.
- I-MR Chart
- A pair of control charts for individual measurements and the moving range between them, used when data arrive one value at a time.
- Mood's Median
- A non-parametric test that compares the medians of two or more groups when the data are not normal.
- Poka-Yoke (Mistake Proofing)
- A design or device that prevents an error or makes it obvious at once, such as a part that fits only one way.
- SIPOC
- A high-level process map that lists the suppliers, inputs, process steps, outputs and customers.
- Value Stream Map
- A map of every step needed to deliver a product or service, showing where time and waste build up.
- Voice of the Customer
- What customers say they need, gathered through surveys, interviews or complaints and turned into requirements.