Why Study with PlanetCert?
The Latest Questions
Practice questions and exam topics aligned with the current exam objectives.
Detailed Explanations
Go beyond the answer. Master the material with comprehensive learning and professional explanations for every concept.

AI-Powered Insights
Personalized preparation guidance that adapts to your performance and identifies weak spots automatically.
Exam Information
Official specifications published by Six Sigma
Exam Format
Skills this practice test covers
- Write a problem statement and a project charter backed by a business case.
- Calculate defects per unit, DPMO, First Time Yield and Rolled Throughput Yield from defect data.
- Rank problems with a Pareto chart and trace causes with a fishbone diagram.
- Map a process with SIPOC and rate its failure modes in an FMEA.
- Judge a measurement system with a Gage R&R study before trusting its data.
- Hold the gains with 5S, Kanban, Poka-Yoke and a control plan.
Explore related topics
LSSYB exam content
3 domains · 28 topics · 210 of 218 questions sorted by domain
Define Phase70 questions
The Define Phase sets up the project. It covers what Six Sigma means, the roles on a team, the voice of the customer, basic metrics, choosing a project with a business case, and the lean ideas of waste and 5S.
Skills tested
- Explain the problem-solving strategy Y = f(x) and the voice of the customer, business and employee.
- Calculate basic Six Sigma metrics such as DPU, DPMO, FTY and RTY.
- Build a business case and project charter, and capture the financial benefits.
- Identify the seven elements of waste and apply the five steps of 5S.
- Describe the Six Sigma roles, from the Champion to the belts on the team.
Questions by topic
- The Seven Elements of Waste6
- Cost of Poor Quality (COPQ)8
- Pareto Analysis (80:20 rule)6
- Basic Six Sigma Metrics6
- 5S Methodology6
- Six Sigma Roles & Responsibilities7
- Building a Business Case & Project Charter10
- Critical to Quality Characteristics (CTQs)7
- The Lean Enterprise6
- The Problem Solving Strategy Y = f(x)7
- Cost Benefit Analysis1
Measure Phase70 questions
The Measure Phase maps the process and checks the data. Candidates draw cause and effect diagrams and process maps, rate risks in an FMEA, describe data with basic statistics, test the measurement system and judge process capability.
Skills tested
- Draw a fishbone diagram, a SIPOC and a value stream map for one process.
- Link inputs to outputs with an X-Y Diagram and rank failure modes by Risk Priority Number.
- Check a measurement system for precision, accuracy, bias, linearity and stability.
- Run a Gage R&R study and an attribute MSA before trusting the data.
- Confirm that a process is stable before calculating its capability.
Questions by topic
- Cause & Effect / Fishbone Diagrams6
- Process Mapping, SIPOC, Value Stream Map6
- Basic Statistics6
- Gage Repeatability & Reproducibility7
- Measurement System Analysis6
- Concept of Stability7
- X-Y Diagram6
- Capability Analysis7
- Failure Modes & Effects Analysis (FMEA)8
- Graphical Analysis10
- Basic Six Sigma Metrics1
Control Phase70 questions
The Control Phase keeps an improvement in place after the project ends. It pairs lean controls (5S, Kanban and Poka-Yoke) with a Six Sigma control plan, a response plan and a cost benefit analysis.
Skills tested
- Sustain 5S with audits and visual controls.
- Use Kanban cards to signal when work or stock is needed.
- Design Poka-Yoke devices that prevent a mistake or catch it at once.
- Write a control plan and a response plan that say who acts when a measure drifts.
- Weigh the cost of each control against its benefit.
Questions by topic
- Poka-Yoke (Mistake Proofing)14
- Elements of the Control Plan10
- Kanban16
- Control Methods for 5S13
- Elements of the Response Plan11
- Cost Benefit Analysis6
Requirements
- No formal prerequisites.
- Recommended: a working knowledge of business processes and of simple statistics such as the mean.
About the LSSYB exam
LSSYB covers the Lean Six Sigma Yellow Belt: the knowledge a team member needs to support an improvement project. Its outline is the IASSC Yellow Belt Body of Knowledge, which covers three of the five DMAIC project phases (Define, Measure and Control) and leaves out Analyze and Improve. Several certifying bodies award a Yellow Belt through their own exams, and IASSC's exam on this outline is IASSC Certified Lean Six Sigma Yellow Belt.
The PlanetCert practice test gives the three phases the same number of questions. Kanban and Poka-Yoke come up most in the Control Phase, and the business case and project charter lead the Define Phase. Explanations show the working for calculation questions, such as a Risk Priority Number or a Rolled Throughput Yield. Flashcard Mode suits the many named tools, from SIPOC and the X-Y Diagram to Poka-Yoke, and Brainy AI Assistant can explain how a control plan differs from a response plan.
How to earn the certification
- Earns
- Lean Six Sigma Yellow BeltFoundation
- Before
- LSSWB Lean Six Sigma White Belt
Optional. The awareness level below Yellow Belt, which many Yellow Belt courses already cover.
- LSSWB Lean Six Sigma White Belt
- After
- LSSGB Lean Six Sigma Green Belt
The next belt. Green Belts lead small improvement projects and use more advanced tools.
- LSSGB Lean Six Sigma Green Belt
How to prepare for LSSYB
- 1
Check off the IASSC topic list
The Body of Knowledge numbers every topic, from 1.1.1 Meanings of Six Sigma to 5.3.3 Elements of the Response Plan. Mark each one done only when it can be explained with an example from work.
- 2
Pick one familiar process to study
Choose a process from daily work, such as approving expense claims. Draw its SIPOC, fishbone diagram and value stream map, then use it as the example for every later topic.
- 3
Work the metrics by hand
Calculate DPU, DPMO, First Time Yield and Rolled Throughput Yield from small sets of made-up data, then a mean and a standard deviation. The Define and Measure phases both use these numbers.
- 4
Spend extra hours on measurement
The Measure Phase holds most of the statistics: normal distributions, Gage R&R and process capability. Work one capability example from raw data to a Cpk value.
- 5
Sit the practice test under time
Take the LSSYB practice test in Timed Mode once the topic list is checked off. Ask Brainy AI Assistant to redo any missed calculation one step at a time.
Start a timed LSSYBrun
Who LSSYB is for
- Team members and subject matter experts who join Lean Six Sigma projects led by Green Belts or Black Belts.
- Operations and quality staff who collect data and draw process maps for improvement work.
- Supervisors who run small improvement projects in their own area.
- Newcomers to Lean Six Sigma who plan to move on to a Green Belt.
Typical job titles: Process improvement team member · Quality assurance specialist · Operations analyst · Operations supervisor · Production supervisor
LSSYB glossary
20 terms from the exam objectives and the vendor's official material, each defined in a sentence.
- 5S
- A workplace method in five steps (Sort, Straighten, Shine, Standardize and Self-Discipline) that keeps a work area clean and organized.
- Cost of Poor Quality (COPQ)
- The money lost to defects, rework, scrap, returns and other failures.
- Critical to Quality Characteristics (CTQs)
- Measurable features of a product or service that customers see as essential to quality.
- Defects Per Million Opportunities
- Shortened to DPMO. The number of defects for every million chances for a defect, so that simple and complex processes can be compared.
- DMAIC
- The five phases of a Six Sigma project, in order: Define, Measure, Analyze, Improve and Control.
- Failure Modes & Effects Analysis (FMEA)
- A table that lists how a process can fail and rates each failure for severity, occurrence and detection.
- Gage R&R
- A study that shows how much of the measured variation comes from the measuring system itself, both from repeat readings and from different operators.
- Kanban
- A pull system that uses cards or signals to start work or restock only when there is a need.
- Pareto Analysis (80:20 rule)
- Ranking problems by size, on the idea that a few causes produce most of the effect.
- Poka-Yoke (Mistake Proofing)
- A device or design that makes an error impossible or detects it at once.
- Process Capability
- How well a stable process meets its specification limits, often expressed with indices such as Cp and Cpk.
- Project Charter
- The document that states a project's problem, goal, scope and team, and gives the team its mandate.
- Response Plan
- The part of the control plan that says who acts, and how, when a measure goes outside its limits.
- Risk Priority Number
- Severity times occurrence times detection in an FMEA; the failure modes with the highest numbers are dealt with first.
- Rolled Throughput Yield
- The chance that a unit passes every step of a process with no defects, found by multiplying the yields of the steps.
- Seven Elements of Waste
- Overproduction, correction, inventory, motion, overprocessing, conveyance and waiting, the seven kinds of waste that lean thinking removes.
- SIPOC
- A high-level process map that lists suppliers, inputs, process steps, outputs and customers.
- Voice of the Customer
- What customers need and expect from a process, gathered so that the project measures what matters to them.
- X-Y Diagram
- A matrix that scores how strongly each process input (X) affects each output (Y), so that the inputs can be ranked.
- Y = f(x)
- The idea that an output (Y) is a result of its inputs (x), so a project improves the output by finding and controlling the inputs.